VCS-733 ↗

5.0 / 10
Integrity
5.2
Transparency
5.0
Claim Safety
4.6
Documentation
5.4

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB, and the project uses an investment test in the validation report.

missing The latest monitoring report says leakage is not addressed, and there are no buffer pool or reversal details found in the extracted record.

Transparency

verified The project has a named VVB and a long monitoring period documented in the monitoring report.

missing The extracted record does not state the usage monitoring method, and the monitoring report lists many corrective actions.

Claim Safety

verified The project is not CORSIA-eligible, which reduces one channel of double-claim risk.

missing Leakage treatment is inconsistent across reports, and the verified issuance total differs sharply from earlier validation and monitoring figures.

Documentation

verified Multiple official document types were used, including validation, monitoring, PDD, and issuance records.

missing Several key fields are missing or only partially specified, and the extraction record notes a poorly documented set of corrective actions in the monitoring report.

Detailed Analysis

Integrity

The validation report supports an investment-test additionality case and the VVB confirmed it, which is a meaningful positive for project integrity. However, the monitoring report dated 2022-10-05 says leakage is not addressed, and no buffer pool or reversal information was found in the extracted record, so permanence and leakage confidence are limited. The monitoring report also lists many corrective actions, which suggests unresolved implementation issues.

Transparency

The project has a named verifier, LGAI Technological Center, S.A. (Applus+ Certification), and the monitoring period is clearly stated. Still, the usage monitoring method is not found in the available documents, and the record does not provide a quantified leakage deduction or a clear public-facing treatment of several MRV elements. The presence of numerous corrective actions further weakens transparency.

Claim Safety

Claim safety is weakened by inconsistent treatment of leakage and by large shifts in credited volume across documents. The monitoring report shows 55,888 tCO2e claimed and verified in the latest record, while earlier validation and monitoring documents referenced 30,964 tCO2e, so the crediting history is not fully stable. The project is not CORSIA-eligible, which helps, but CCP status is not stated.

Documentation

Documentation breadth is moderate because the extracted record includes validation, monitoring, PDD, and issuance documents, with 20 documents used overall. The extraction confidence is high, which is positive, but several important fields are missing, including buffer pool, usage monitoring method, and reversal details. The crediting period also appears to have changed between issuance and the later monitoring record, adding complexity to the documentary trail.

Overall

I privileged the more recent and more specific monitoring report for leakage and issuance figures, and the validation report for additionality, because those are the latest official sources in the extracted record. The contradictions matter: additionality is described as a barrier test in the PDD but as an investment test in validation; issuance totals move from 30,964 to 55,888; safeguards and grievance documentation also conflict; and the crediting period differs between issuance and later monitoring records. These inconsistencies reduce reliability, so the project scores as middling rather than strong.

Audit Analysis

This is a registered VCS biomass avoidance project with VVB-confirmed additionality and no reported reversal events, but the evidence base has several reliability gaps. The latest monitoring record leaves leakage unaddressed, shows many corrective actions, and the project’s claimed and verified issuance figures changed materially across documents, which weakens confidence in the credit claim.

Project Description

The Sitarganj carbon project installed a 30TPH biomass-based boiler and utilized biogas produced from the anaerobic digestion of wastewater within the plant premises to generate steam for process heating. The project activity aimed to generate 30TPH of steam for process heating in the starch manufacturing process, located in the ELDECO SIDCUL industrial park at Sitarganj.

Red Flags

  • Leakage is not addressed in the latest monitoring report, despite an earlier report describing it as negligible.
  • Multiple contradictions exist across documents, including the additionality test type, issuance totals, safeguards, and crediting period.

Credit Vintages

Issued Retired Available
2008
1,886 1,886 0
2009
12,831 12,816 15
2010
12,736 12,736 0
2011
27,639 27,639 0
2012
33,882 33,882 0
2013
30,964 30,964 0
2014
33,762 0 33,762
2015
15,663 232 15,431
2016
4,932 3,134 1,798
2017
1,531 108 1,423
Total 175,826 123,397 52,429

Cosa migliorerebbe questo punteggio

  • Provide a clear, reconciled leakage assessment with a quantified deduction or a robust justification in the latest monitoring documentation.
  • Publish a document reconciliation note that explains the conflicting additionality, issuance, safeguards, and crediting-period values across the project record.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed but test type conflicts

Permanence

Avoidance project, but buffer and reversal details missing

Leakage

Leakage not addressed in latest monitoring

Baseline

Project baseline stated, reassessment timing missing

Safeguards

Some safeguards present, but FPIC conflict

Double-claim

Not CORSIA-eligible; CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-15 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti