Biomass based thermal energy generation at M/s. Ester Industries limited, Khatima, Uttarakhand, India

CDM-3182 ↗

#74of 352 in Biomass#470of 975 in India#657of 1459 in CDM (UNFCCC)#26of 115 in AMS-I.C

5.2/ 10
Integrity
5.5
Transparency
4.5
Claim Safety
5.5
Documentation
5.5

Audit Analysis

A CDM biomass energy substitution project validated by SGS with a VVB-confirmed common-practice additionality test, but the investment barrier was removed during validation and the baseline was revised from coal to furnace oil, introducing moderate uncertainty. Leakage is claimed as negligible with a 0% deduction, and several key operational parameters (FNRB, usage rate, grid emission factor) are absent from the extracted record. The project delivered roughly 103% of its pro-rata credit expectation for the first monitoring period, which is reassuring, but the overall documentation set covers only one monitoring window of a seven-year crediting period.

Red Flags

  • Investment barrier was removed from the additionality analysis during validation, leaving only the prevailing-practice ('first of its kind') barrier as the sole basis — a single-barrier additionality case is weaker than a multi-barrier one.
  • Baseline fuel was revised from coal to furnace oil during validation, a material change that reduces the claimed emission factor but also signals that the original PDD baseline may not have reflected actual practice.
  • Leakage deduction is 0% with a 'deemed negligible' justification, yet an appendix document apparently contained a quantified leakage estimate, creating an inconsistency in how leakage was ultimately treated.
  • Nine corrective action requests and eight clarification requests were raised and closed during validation, indicating a substantial number of issues that had to be resolved before the project could be registered.

Credit Vintages

IssuedRetiredAvailable
2012
10,725010,725
Total10,725010,725

Risk Indicators

Additionality

VVB-confirmed but single-barrier (investment barrier removed

Permanence

Energy substitution; no carbon stock at risk; no reversals

Leakage

0% deduction, 'deemed negligible'; appendix inconsistency

Baseline

Project-specific; revised from coal to furnace oil during va

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-26AMS IC

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents