Blue Fire Bio wastewater treatment and biogas utilization project
#169of 268 in Biogas#34of 48 in Thailand#1143of 1459 in CDM (UNFCCC)#32of 55 in AMS-III.H
Audit Analysis
A CDM methane-avoidance biogas project in Thailand validated by RINA Services, with a measured project-specific baseline and no corrective actions required. However, a seven-fold discrepancy between the PDD and validation report on total emissions reductions, a 0% leakage deduction justified only as 'deemed negligible,' and the absence of any monitoring-period data or verified ERR figures significantly limit confidence in the project's claims. The low extraction confidence and limited document set further constrain the assessment.
Red Flags
- Total ERR in the PDD (419,286 tCO2e) is roughly seven times the figure confirmed in the validation report (59,898 tCO2e); the basis for this gap is unexplained in the available documents.
- Leakage deduction is 0% with only a 'deemed negligible' justification, which is thin for a biogas/wastewater project where uncontrolled methane release is a realistic pathway.
- No monitoring-period data, verified ERR, or FNRB values are available in the extracted record, making it impossible to confirm actual delivery against the ex-ante estimate.
- Minimum extraction confidence is rated low, indicating at least one key document was poorly readable, reducing reliability of the extracted facts.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2015 | 94,755 | 0 | 94,755 | |
| Total | 94,755 | 0 | 94,755 |
Risk Indicators
AMS built-in criteria present but VVB confirmation not expli
mixed evidence / unresolved risk
0% deduction, 'deemed negligible' justification, internal co
Project-specific measured baseline, reassessed 2019, not jur
Grievance mechanism and safeguards mentioned; FPIC not state
CCP and CORSIA eligibility not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →