Boiler Fuel Conversion from RFO to Biomass Based Briquettes at Pfizer Limited, Thane (M.S.), India
#14of 352 in Biomass#184of 975 in India#218of 1459 in CDM (UNFCCC)#3of 115 in AMS-I.C
Audit Analysis
A CDM biomass fuel-switching project at Pfizer Thane with a VVB-confirmed combined additionality test and conservative under-delivery of emissions reductions (46% of pro-rata expectation), but weakened by a project-specific baseline, contradictory leakage justifications across documents, and a shift from measured to calculated monitoring for several inputs. The project is well-documented with high extraction confidence, though several operational details remain unreported.
Red Flags
- Leakage justification is contradictory: the validation report (2007) states leakage was 'deemed negligible' while the monitoring report (2010) states it was 'quantified', yet both documents apply a 0% deduction — the basis for the zero deduction is unclear
- Multiple monitoring inputs (diesel for biomass and briquette transport, electricity at the briquetting plant) were changed from measured to calculated values during the monitoring period, a change the EB questioned and the DOE defended as falling under estimation rather than monitoring
- The PDD initially cited the wrong methodology (Type III.B) before being corrected to AMS-I.C, indicating a documentation error at registration
- Total verified ERR is not reported in the extracted record, preventing independent verification of the 5,721 tCO₂e figure from the monitoring report
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 4,685 | 0 | 4,685 | |
| Total | 4,685 | 0 | 4,685 |
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
0% deduction, contradictory justification
Project-specific, no reassessment data
Mentioned, benefit sharing described, FPIC/grievance not sta
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →