BOR BIOGAS-SOLAR HYBRID PROJECT
GS-3365 ↗ · current registry ID: GS11344
#123of 268 in Biogas#230of 295 in Turkey#1001of 1801 in Gold Standard (GS)
Audit Analysis
The Bor Biogas-Solar Hybrid Project is a real, VVB-verified biogas facility in Turkey with a solid combined additionality test, but it is burdened by an unusually high volume of corrective actions (61 CARs), a solar-panel addition that bypassed the design-change process, and a project-specific modeled baseline with no quantified leakage deduction. The ERR figures nearly doubled between validation and verification, and several key MRV parameters remain unreported, leaving meaningful uncertainty about the robustness of the claimed reductions.
Red Flags
- 61 Corrective Action Requests and 18 Clarification Requests were raised during verification, indicating substantial initial documentation gaps (verification report, Jan 2026).
- A 5.33 MWm solar PV array was added to the project without applying the Gold Standard design-change process; the solar electricity generation was excluded from the credit calculation, and the installation was not observed during the site visit (verification report).
- The methodology is misidentified as ACM0022 (a CDM methodology) in parts of the verification report, creating confusion about which ruleset governs the project.
- Leakage deduction is 0% on the basis that it is 'deemed negligible,' yet the validation report (Dec 2023) described leakage as 'quantified' — the approach shifted between documents without a clear reconciliation.
- The claimed ERR nearly doubled from 191,916 tCO₂e at validation (Dec 2023) to 384,357.8 tCO₂e at verification (Jan 2026), a change that is not fully explained in the extracted record.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 75,074 | 0 | 75,074 | |
| 2023 | 207,470 | 0 | 207,470 | |
| 2024 | 132,783 | 0 | 132,783 | |
| Total | 415,327 | 0 | 415,327 |
Risk Indicators
Combined test VVB-confirmed
no reversals
0% deduction, deemed negligible only
Project-specific, modeled, no reassessment date
Grievance & benefit-sharing present; FPIC not stated
CORSIA & CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →