Skip to main content
GSBiogas - ElectricityTurkeyGeneral Methodologyv2.1

BOR BIOGAS-SOLAR HYBRID PROJECT

GS-3365 ↗ · current registry ID: GS11344

#123of 268 in Biogas#230of 295 in Turkey#1001of 1801 in Gold Standard (GS)

4.8/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
4.8
Documentation
5.0

Audit Analysis

The Bor Biogas-Solar Hybrid Project is a real, VVB-verified biogas facility in Turkey with a solid combined additionality test, but it is burdened by an unusually high volume of corrective actions (61 CARs), a solar-panel addition that bypassed the design-change process, and a project-specific modeled baseline with no quantified leakage deduction. The ERR figures nearly doubled between validation and verification, and several key MRV parameters remain unreported, leaving meaningful uncertainty about the robustness of the claimed reductions.

Red Flags

  • 61 Corrective Action Requests and 18 Clarification Requests were raised during verification, indicating substantial initial documentation gaps (verification report, Jan 2026).
  • A 5.33 MWm solar PV array was added to the project without applying the Gold Standard design-change process; the solar electricity generation was excluded from the credit calculation, and the installation was not observed during the site visit (verification report).
  • The methodology is misidentified as ACM0022 (a CDM methodology) in parts of the verification report, creating confusion about which ruleset governs the project.
  • Leakage deduction is 0% on the basis that it is 'deemed negligible,' yet the validation report (Dec 2023) described leakage as 'quantified' — the approach shifted between documents without a clear reconciliation.
  • The claimed ERR nearly doubled from 191,916 tCO₂e at validation (Dec 2023) to 384,357.8 tCO₂e at verification (Jan 2026), a change that is not fully explained in the extracted record.

Credit Vintages

IssuedRetiredAvailable
2022
75,074075,074
2023
207,4700207,470
2024
132,7830132,783
Total415,3270415,327

Risk Indicators

Additionality

Combined test VVB-confirmed

Permanence

no reversals

Leakage

0% deduction, deemed negligible only

Baseline

Project-specific, modeled, no reassessment date

Safeguards

Grievance & benefit-sharing present; FPIC not stated

Double-claim

CORSIA & CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents