Skip to main content
CARImproved Forest Management - ARB ComplianceCALIFORNIA, USGeneral Methodologyv2.0

Bowman Lake

CAR-1112 ↗

#68of 69 in REDD+#113of 115 in United States#30of 32 in Climate Action Reserve (CAR)

0.8/ 10
Integrity
0.5
Transparency
0.5
Claim Safety
1.5
Documentation
1.0

Audit Analysis

The extracted records contain almost no quantifiable project metrics, with critical fields for additionality, baseline validation, and emission reductions entirely missing. Low extraction confidence and unknown document types severely limit the ability to verify environmental integrity or claim safety. Without independent verification or transparent monitoring data, this project cannot be reliably assessed.

Red Flags

  • Complete absence of additionality testing and independent verification
  • Missing baseline methodology, buffer pool contributions, and leakage deductions
  • Low extraction confidence with unknown document types obscures all MRV data
  • CORSIA and CCP eligibility status not stated, leaving double-claiming risk unassessed
  • Leakage not addressed in project documentation
  • Buffer pool size not disclosed in available documents

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

No assessment found

Permanence

Buffer pool absent/unaddressed

Leakage

No leakage treatment documented

Baseline

Methodology not stated

Safeguards

None documented

Double-claim

Status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-05General Methodology v2.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents