Bowman Lake
#68of 69 in REDD+#113of 115 in United States#30of 32 in Climate Action Reserve (CAR)
Audit Analysis
The extracted records contain almost no quantifiable project metrics, with critical fields for additionality, baseline validation, and emission reductions entirely missing. Low extraction confidence and unknown document types severely limit the ability to verify environmental integrity or claim safety. Without independent verification or transparent monitoring data, this project cannot be reliably assessed.
Red Flags
- Complete absence of additionality testing and independent verification
- Missing baseline methodology, buffer pool contributions, and leakage deductions
- Low extraction confidence with unknown document types obscures all MRV data
- CORSIA and CCP eligibility status not stated, leaving double-claiming risk unassessed
- Leakage not addressed in project documentation
- Buffer pool size not disclosed in available documents
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
No assessment found
Buffer pool absent/unaddressed
No leakage treatment documented
Methodology not stated
None documented
Status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →