BRASCARBON Methane Recovery Project BCA-BRA-01
#73of 211 in Brazil#726of 1459 in CDM (UNFCCC)#24of 105 in AMS-III.D
Audit Analysis
A CDM methane-avoidance project (biogas flaring, AMS-III.D) with VVB-confirmed additionality but a project-specific modeled baseline, no stated buffer pool, and a very low verified-to-claimed ERR ratio that raises over-crediting concerns. Eighteen material findings and seven corrective actions at validation indicate a weak initial submission, and the project is now past its crediting period with several key MRV parameters undocumented.
Red Flags
- Verified ERR of 34.105 for the 2011–2012 monitoring period is only ~0.06% of the pro-rata expectation (~58,149 tCO2e) derived from the PDD lifetime claim of 348,894 tCO2e over 7 years, suggesting either a unit mismatch or severe under-delivery
- Eighteen material findings and seven corrective actions were raised at validation, including incorrect site identification, missing additionality demonstration, and non-transparent emission-reduction calculations
- Leakage justification is contradictory across monitoring reports: 'deemed negligible' in the 2013 report versus 'not addressed' in the 2010 report
- Crediting period dates differ between the validation report (2008-10-01 to 2015-10-01) and the 2013 monitoring report (2009-03-16 to 2016-03-15), with no documented explanation for the shift
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 19,778 | 0 | 19,778 | |
| 2012 | 58,841 | 0 | 58,841 | |
| 2013 | 36,996 | 0 | 36,996 | |
| 2014 | 43,477 | 0 | 43,477 | |
| Total | 159,092 | 0 | 159,092 |
Risk Indicators
VVB-confirmed combined test
reversal risk unquantified
0% deduction; justification inconsistent across reports
Project-specific modeled baseline; reassessment date not sta
Safeguards mentioned; FPIC and grievance mechanism not docum
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →