Skip to main content
VCSavoidanceIndia Registry: Late to verifyAMS-I.D

Bundled Grid Connected 2.9 M.W. Wind Power Project In India By Kamal Engineering Corporation [Unit Of Kec Industries Ltd]

VCS-245 ↗

#1481of 1935 in Renewable energy#811of 975 in India#1057of 1339 in Verra (VCS)#497of 806 in AMS-I.D

4.3/ 10
Integrity
4.5
Transparency
3.5
Claim Safety
5.0
Documentation
4.0

Audit Analysis

A 2.9 MW wind power avoidance project in India with a fundamentally sound design (jurisdictional baseline, VVB-confirmed investment additionality, no inherent reversal risk), but severely undermined by nine material findings in the verification report, eight required corrective actions, a large discrepancy between initially claimed and finally verified emission reductions (16,200 vs 5,479 tCO₂), and a 'Late to verify' registry status indicating ongoing compliance difficulties. Safeguards documentation is absent, and multiple contradictions across documents reduce confidence in the data record.

Red Flags

  • Registry status is 'Late to verify', indicating the project is not meeting its verification schedule obligations
  • Nine material findings in the verification report, including monitoring-period overlap with a prior period, incorrect grid-supply values, missing calibration certificates, and unexplained differences between estimated and actual emission reductions
  • Final verified ERR (5,479 tCO₂) is only 36% of the initially verified figure (15,200 tCO₂) from the earlier verification report, suggesting the original monitoring was substantially flawed
  • No FPIC conducted, no grievance mechanism in place, and safeguards not mentioned in the validation report
  • Seven contradictions across documents, including conflicting baseline methods (jurisdictional vs project-specific) and conflicting additionality test types (investment vs combined)

Credit Vintages

IssuedRetiredAvailable
2006
16,2002,52313,677
2009
5,4795,4790
Total21,6798,00213,677

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversal risk

Leakage

0% deduction, reasonable for grid wind

Baseline

Jurisdictional but contradicted across docs

Safeguards

No FPIC, no grievance mechanism

Double-claim

CORSIA and CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01AMS I D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents