Bundled Grid-Connected Wind Electricity Generation Project Identified As Bundle E3 In Maharashtra And Gujarat, India

VCS-309 ↗

#919of 1935 in Renewable energy#471of 975 in India#580of 1339 in Verra (VCS)#305of 806 in AMS-I.D

5.2/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
5.5
Documentation
4.5

Audit Analysis

A bundled wind energy project in India with a VVB-confirmed investment additionality test and a jurisdictional grid baseline, but hampered by five inter-document contradictions, material findings on meter calibration and record-keeping, an absent buffer pool, and a 'Late to verify' registry status. The project delivered approximately 97% of the pro-rata ex-ante expectation for the elapsed monitoring period, indicating reasonable claim accuracy, yet the documentation gaps and unresolved contradictions limit confidence in the overall credit quality.

Red Flags

  • Registry status is 'Late to verify', indicating the project has not completed its verification cycle on schedule, raising concerns about ongoing MRV compliance.
  • Five contradictions between the PDD, validation report, and verification report (benefit sharing, safeguards, baseline method, leakage justification, and ERR figures) signal inconsistent project documentation.
  • Material findings include missing calibration certificates and absent Joint Meter Reading sheets for multiple months, requiring correction factors and exclusion of energy data.
  • FPIC is not confirmed, no grievance mechanism is documented, and safeguards are inconsistently reported across documents.

Credit Vintages

IssuedRetiredAvailable
2007
6,7505,7101,040
2008
12,08110,5411,540
2009
10,9429,5481,394
Total29,77325,7993,974

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

no reversal events reported

Leakage

0% deduction, deemed negligible (appropriate for wind)

Baseline

Jurisdictional grid EF but method contradicted across documents

Safeguards

No FPIC, no grievance mechanism, safeguards inconsistent

Double-claim

CORSIA and CCP status not stated in any document

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents