Bundled Grid Connected Wind Power Generation Abi Energy Bundle 3
#1219of 1935 in Renewable energy#645of 975 in India#940of 1459 in CDM (UNFCCC)#398of 806 in AMS-I.D
Audit Analysis
A CDM wind power project in India with a sound fundamental design (jurisdictional baseline, VVB-confirmed investment additionality test, negligible leakage) but undermined by 13 material findings in the validation report, a ten-fold discrepancy in claimed emissions reductions between the PDD and validation report, and a low-confidence extraction record with no monitoring or verification reports available. The project's core claim is credible, but the documentation and data-reliability gaps limit confidence in the specific credit quantities.
Red Flags
- Ten-fold discrepancy in total emissions reductions: the PDD (2011-12-04) states 187,010 tCO2e while the validation report (2011-12-05) states 18,701 tCO2e — a factor-of-10 difference that raises data-reliability concerns even if likely a typographical error.
- Thirteen material findings in the validation report, including an infeasible monitoring plan (CAR 07), incorrect IRR and depreciation calculations (CAR 05), emission-factor calculation inconsistencies (CAR 06), and an unrealistic crediting-period start date (CAR 09).
- No monitoring report, verification report, or monitoring period data found in the extracted record; the project's actual performance over its 2011–2021 crediting period cannot be assessed.
- Minimum extraction confidence rated 'low', indicating at least one key document was poorly readable, reducing reliability of all extracted figures.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Avoidance project, no inherent reversal risk
0% with negligible justification, consistent with wind
Jurisdictional grid EF, 2009
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →