Bundled Renewable Power Project by Jai Bharat Gp (EKIESL-CDM.April16-02)
#186of 975 in India#221of 1459 in CDM (UNFCCC)#129of 806 in AMS-I.D
Audit Analysis
A CDM wind project in India using the standard AMS-I.D methodology with a jurisdictional grid baseline and VVB-confirmed investment additionality. The project is fundamentally sound in design, but a significant discrepancy between the ex-ante ERR estimate in the validation report (12,940 tCO₂e) and the figure reported in the monitoring report (54,662 tCO₂e) raises data-reliability concerns, and the grid emission factor dates from 2014. All nine corrective actions from the verification process were resolved, and no outstanding findings remain.
Red Flags
- ERR contradiction: the validation report (2017) states a total claimed ERR of 12,940 tCO₂e while the monitoring report (2021) reports 54,662 tCO₂e — a 4.2× difference that is not explained in the available documents
- Grid emission factor of 0.977 tCO₂/MWh is from 2014 and has not been updated in the extracted record
- Total verified ERs for the monitoring period (2017–2020) are not found in the available documents, preventing an over- or under-delivery check
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 54,056 | 0 | 54,056 | |
| Total | 54,056 | 0 | 54,056 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deemed negligible, appropriate for wind
Jurisdictional grid EF from 2014, not updated
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →