Bundled Solar Power Project by EKI Energy Services Limited (EKIESL-CDM.July-14-01)
#299of 1935 in Renewable energy#152of 975 in India#185of 1459 in CDM (UNFCCC)#114of 806 in AMS-I.D
Audit Analysis
A bundled small-scale solar power project in India validated under CDM AMS I.D. v18.0 with a VVB-confirmed combined additionality test and a jurisdictional grid baseline. The project is inherently low-risk on permanence (no carbon stock) and leakage (grid-connected generation), but the record is hampered by low extraction confidence, missing monitoring data, and a notable discrepancy in claimed emission reductions between the PDD and the validation report.
Red Flags
- Total ERR discrepancy: the PDD (May 2017) lists 160,363 tCO2e while the validation report (Feb 2018) confirms only 112,231 tCO2e — a 30% reduction that is not explicitly reconciled in the extracted record
- Low extraction confidence across the document set means several key fields (monitoring period, buffer pool, FN/RB, usage rates) could not be verified
- No monitoring report data found in the extracted record despite the crediting period (2017–2024) having elapsed
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Solar generation – no reversal risk
0% – negligible for grid-connected solar
Jurisdictional grid EF (2014 CEA)
Mentioned but FPIC and grievance mechanism not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →