Bundled Solar Project 2 by Aditya Birla Group of Companies
GS-2037 ↗ · current registry ID: GS7549
#479of 1935 in Renewable energy#248of 975 in India#217of 1801 in Gold Standard (GS)#359of 1287 in ACM0002
Audit Analysis
A Gold Standard solar thermal electricity project in India with a VVB-confirmed investment additionality test and a well-known verification body (Applus+ Certification). However, a project-specific baseline, a 0% leakage deduction with only a 'deemed negligible' justification, and a verified ERR roughly three times the pro-rata ex-ante expectation raise material concerns about baseline robustness and over-crediting risk. Several key fields (buffer pool, CORSIA/CCP status, FNRB) are absent from the extracted record, limiting the depth of assurance.
Red Flags
- Verified ERR of 106,789 tCO₂e is approximately 295% of the pro-rata ex-ante expectation (~36,200 tCO₂e) for the elapsed monitoring period, indicating a very large over-delivery relative to the PDD estimate of 77,735 tCO₂e for the full 5-year crediting period.
- The monitoring period (2022-09-01 to 2024-12-31) extends approximately two months beyond the crediting period end date (2024-10-24), meaning part of the verified emissions reductions may fall outside the valid crediting window.
- Baseline method is contradictory: the verification report (2023-10-23) describes a project-specific baseline while the monitoring report (2023-10-04) describes a jurisdictional baseline; the VVB's project-specific characterisation is less robust.
- No buffer pool percentage is stated in any available document, leaving permanence risk unquantified despite the absence of a stated reversal-risk mitigation mechanism.
- FPIC status is directly contradictory: the validation report (2021-11-15) records FPIC as conducted, while the PDD (same date) records it as not conducted.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2019 | 13,914 | 13,914 | 0 | |
| 2020 | 77,195 | 77,195 | 0 | |
| 2021 | 77,391 | 429 | 76,962 | |
| 2022 | 50,873 | 0 | 50,873 | |
| Total | 219,373 | 91,538 | 127,835 |
Risk Indicators
VVB-confirmed investment test
low inherent reversal risk for solar
0% deduction, 'deemed negligible' but VVB report silent
Project-specific per VVB; no reassessment date stated
FPIC and grievance mechanism present but FPIC status contradictory
CORSIA and CCP status both not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →