Bundled Wind Power Project in Gujarat and Tamil Nadu
Score Breakdown
Integrity
verified Additionality was tested through an investment test and the VVB confirmed it in the validation report.
missing Leakage is not addressed in the monitoring report, and reversal treatment is not addressed; the project is wind power, so the permanence risk is low but not fully documented.
Transparency
verified The monitoring period is clearly stated, and the VVB is named as TUV SUD South Asia Pvt Ltd.
missing The monitoring report notes missing meter calibration details and blank net generation values for some months, reducing MRV clarity.
Claim Safety
verified The project is a renewable wind project under VCS, which generally lowers baseline and over-crediting risk compared with fossil fuel projects.
missing The monitoring report gives no leakage justification, and the verified emissions reduction figure is inconsistent across validation documents, which raises over-crediting concerns.
Documentation
verified Multiple official documents were used, including validation, monitoring, PDD, and issuance records, with high extraction confidence.
missing The monitoring report requires corrective actions on meter details and missing generation data, showing incomplete documentation quality.
Detailed Analysis
Integrity
The validation report confirms additionality through an investment test and says the VVB verified it, which supports the project’s core integrity case. No material findings were reported, but the monitoring report leaves leakage unaddressed and says reversal treatment is not addressed, so the permanence and leakage record is incomplete. Because this is a wind project, permanence risk is inherently lower, but the documentation still does not fully close the loop.
Transparency
The project has a named VVB and a clearly defined monitoring period in the monitoring report, which helps transparency. However, the report also says details of electricity meters and calibration are missing, and some months have blank net generation values and missing invoice-based generation values. Those gaps reduce confidence in the MRV trail even though the extraction confidence is high.
Claim Safety
Claim safety is weakened by the lack of a leakage justification in the monitoring report and by the inconsistent emissions reduction figures across validation documents. I privileged the more recent validation report value of 39,951 because it is later than the earlier validation figure of 76,282, but the contradiction itself signals reliability risk. The project’s renewable wind nature helps, yet the missing leakage treatment and inconsistent figures keep over-crediting risk above average.
Documentation
Documentation is reasonably broad, with validation, monitoring, PDD, and issuance records all used, and the extraction confidence is high. Still, the monitoring report requires corrective actions on meter and calibration details and on missing generation data, which shows the record is not fully complete. The crediting period is also broader than the monitoring period, so the latest monitoring evidence does not fully cover the whole issuance history.
Overall
I privileged the later validation report for the verified emissions reduction figure of 39,951 because it is more recent than the earlier validation figure of 76,282, but the contradiction materially lowers confidence in the emissions claim. I also privileged the monitoring report for leakage and safeguard statements because it is the most recent operational evidence, even though it conflicts with the validation report on leakage being not applicable and on FPIC/benefit-sharing statements. These contradictions, plus missing meter and generation details, justify a cautious mid-range assessment.
Audit Analysis
The project has some strengths: additionality was tested using an investment test and confirmed by the VVB, and no material findings were reported. However, the monitoring record leaves important gaps on leakage, meter calibration, and some generation inputs, which weakens confidence in the issued credits. There are also contradictions across documents on total verified emissions reductions, leakage treatment, and social safeguard statements, so the record is not fully reliable.
Project Description
Proponent: Multiple Proponents Protocol categories: Energy industries (renewable/non-renewable sources) Protocols: AMS-I.D. Estimated annual GHG reductions: 29987 tCO2e Region: Asia Registration date: 2021-02-23
Red Flags
- The monitoring report says leakage was not addressed, while the validation report treated it as not applicable.
- The verified emissions reduction figure differs sharply across validation documents, and the monitoring report contains blank or missing generation values for some months.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2017 | 10,716 | 10,716 | 0 | |
| 2018 | 26,781 | 26,781 | 0 | |
| 2019 | 33,891 | 21,381 | 12,510 | |
| 2020 | 28,837 | 4,589 | 24,248 | |
| 2021 | 18,111 | 3,544 | 14,567 | |
| Total | 118,336 | 67,011 | 51,325 |
Cosa migliorerebbe questo punteggio
- Provide a reconciled emissions reduction schedule that explains the difference between the 39,951 and 76,282 figures and ties each value to the correct issuance period.
- Add complete meter calibration records, monthly generation inputs, and a clear leakage and reversal treatment statement in the monitoring documentation.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
Investment test VVB-confirmed
No reversal treatment documented
Leakage not addressed in monitoring
Project baseline, reassessment not stated
FPIC and grievance noted, but inconsistent
CORSIA/CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →