Bundled Wind Power Project in Tamil Nadu, India, Co-ordinated by Tamil Nadu Spinning Mills Association(TASMA-V1)

VCS-250 ↗

#802of 1935 in Renewable energy#399of 975 in India#503of 1339 in Verra (VCS)#629of 1287 in ACM0002

5.3/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
6.0
Documentation
4.0

Audit Analysis

A long-running (since 2006) bundled wind power project under VCS with a confirmed investment additionality test and a jurisdictional baseline, but the verification record is marred by 11 material findings, over 20 corrective actions, a seven-year gap between the monitoring period and the verification report, and a low extraction confidence rating. The core methodology (ACM0002) is well-established for wind, and the ERR figures for the 2015–2016 period are internally consistent, but the volume of unresolved documentation issues and the absence of FPIC temper confidence in the project's overall rigour.

Red Flags

  • 11 material findings and 20+ corrective actions remain open in the 2023 verification report, including unresolved meter calibration issues and the application of a 'twice the maximum allowable error' adjustment method
  • Seven-year gap between the monitoring period (Jan 2015 – Mar 2016) and the verification report date (Dec 2023), raising questions about data currency and audit trail
  • Free, Prior and Informed Consent (FPIC) was not conducted, despite the project's long operational history in a community setting
  • Low extraction confidence across the document set, meaning key data points may be missing or misread
  • Crediting period end date is not stated in any available document, leaving the project's remaining validity unclear

Credit Vintages Exhausted

IssuedRetiredAvailable
2006
50,63150,6310
2007
88,98188,9810
2008
89,52489,5240
2009
89,37889,3780
2010
85,68685,6860
2011
79,85179,8510
2012
90,19090,1900
2013
88,46988,4690
2014
89,41189,4110
Total752,121752,1210

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Wind avoidance – no reversal risk

Leakage

0% deemed negligible – reasonable for grid wind

Baseline

Jurisdictional per 2023 MR but contradicted by 2009 VR

Safeguards

Grievance mechanism present; FPIC not conducted

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents