Audit Analysis
A CDM wind power project in Gujarat with a VVB-confirmed combined additionality test and a jurisdictional baseline, but hampered by five cross-document contradictions, seven closed CARs, and a notable absence of verified ERR figures in the extracted record. The project delivered roughly 74% of its pro-rata ex-ante expectation for the elapsed monitoring period, indicating conservative crediting. Overall a moderate-quality project with reasonable design but documentation and data gaps that limit confidence.
Red Flags
- Five contradictions across documents (leakage treatment, additionality test type, ERR figures, baseline method, crediting period) reduce data reliability
- Total verified ERR is not found in the extracted record, preventing independent verification of actual emissions reductions
- Seven CARs were raised during verification, including gaps in the monitoring plan and inconsistencies between the PDD and other documents
- Grid emission factor is from 2011 and the monitoring report (2021) does not confirm whether it was updated for the full crediting period
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 446,632 | 0 | 446,632 | |
| Total | 446,632 | 0 | 446,632 |
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
0% deduction, contradiction in treatment
Jurisdictional but contradicted by validation report
Safeguards mentioned, FPIC and grievance not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →