Bundled Wind Power Project in Tirunelveli, Tamil Nadu
#480of 1935 in Renewable energy#249of 975 in India#311of 1459 in CDM (UNFCCC)#169of 806 in AMS-I.D
Audit Analysis
A CDM wind power project in Tamil Nadu using a standardized methodology (AMS-I.D v18) with a jurisdictional baseline and investment-test additionality. The project is inherently low-risk on permanence (avoidance of grid emissions) and leakage (deemed negligible), but the absence of any monitoring report or verified ERR figures limits confidence in actual delivery. Documentation is moderate, with a validation report from 2020 and a PDD, but no verification or monitoring reports were found in the extracted record.
Red Flags
- No monitoring report or verified ERR figures found in the extracted record, making it impossible to confirm actual credit delivery against the 34,886 tCO₂e lifetime claim
- One compliance log (CL) was raised during validation regarding the definition of the monitoring parameter (total vs. net electricity exported), indicating initial ambiguity in the MRV protocol
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 21,963 | 0 | 21,963 | |
| 2012 | 35,516 | 0 | 35,516 | |
| Total | 57,479 | 0 | 57,479 |
Risk Indicators
Investment test present but VVB confirmation not explicitly
mixed evidence / unresolved risk
0% deduction, justified as negligible for wind displacement
Jurisdictional baseline, reassessed 2020, grid EF 0.9419
Safeguards mentioned and benefit sharing described, but FPIC
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →