4.8/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
4.5
Documentation
5.5

Audit Analysis

A CDM biomass fuel-substitution project at a Brazilian brewery with a reputable VVB (DNV) and a barrier additionality test, but undermined by six material findings — most critically, DNV's own observation that the investment barrier was not confirmed because funding was secured regardless of boiler type. Corrective actions were mandated and the pro-rata delivery for the first monitoring period is reasonable, yet the cluster of baseline, NCV, and additionality errors in the original PDD raises meaningful over-crediting risk.

Red Flags

  • DNV's validation report flagged that the investment barrier was not confirmed because funding was secured regardless of boiler type, casting doubt on the core additionality claim
  • Six material findings in the monitoring report, including an incorrect NCV value for fuel oil, a non-conservative baseline assumption (5% production increase), and unaccounted animal tallow emissions in backup boilers
  • Leakage treatment shifted from 'quantified' in the 2007 validation report to 'deemed negligible' in the 2009 monitoring report without a clear methodological bridge

Credit Vintages

IssuedRetiredAvailable
2011
46,210046,210
Total46,210046,210

Risk Indicators

Additionality

Barrier test present but DNV flagged funding secured regardl

Permanence

low inherent risk for fuel substitution

Leakage

0% deduction, 'deemed negligible' but shifted from 'quantifi

Baseline

Project-specific, initially non-conservative, corrected

Safeguards

Safeguards mentioned but FPIC and grievance mechanism not do

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-26AMS I.C.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents