Burning of solid biomass for process steam generation for beer manufacture in place of the BPF 3 fuel oil at the Águas Claras do Sul Branch
#131of 352 in Biomass#108of 211 in Brazil#942of 1459 in CDM (UNFCCC)#39of 115 in AMS-I.C
Audit Analysis
A CDM biomass fuel-substitution project at a Brazilian brewery with a reputable VVB (DNV) and a barrier additionality test, but undermined by six material findings — most critically, DNV's own observation that the investment barrier was not confirmed because funding was secured regardless of boiler type. Corrective actions were mandated and the pro-rata delivery for the first monitoring period is reasonable, yet the cluster of baseline, NCV, and additionality errors in the original PDD raises meaningful over-crediting risk.
Red Flags
- DNV's validation report flagged that the investment barrier was not confirmed because funding was secured regardless of boiler type, casting doubt on the core additionality claim
- Six material findings in the monitoring report, including an incorrect NCV value for fuel oil, a non-conservative baseline assumption (5% production increase), and unaccounted animal tallow emissions in backup boilers
- Leakage treatment shifted from 'quantified' in the 2007 validation report to 'deemed negligible' in the 2009 monitoring report without a clear methodological bridge
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 46,210 | 0 | 46,210 | |
| Total | 46,210 | 0 | 46,210 |
Risk Indicators
Barrier test present but DNV flagged funding secured regardl
low inherent risk for fuel substitution
0% deduction, 'deemed negligible' but shifted from 'quantifi
Project-specific, initially non-conservative, corrected
Safeguards mentioned but FPIC and grievance mechanism not do
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →