Skip to main content
CCLand use (AFOLU)ColombiaGeneral Methodologyv2.1

CARBONO RINCCO

ECO-59 ↗

#58of 124 in Colombia#47of 99 in CerCarbono (CC)

5.0/ 10
Integrity
5.0
Transparency
4.5
Claim Safety
5.0
Documentation
5.5

Audit Analysis

CARBONO RINCCO is a long-running Colombian AFOLU project (since 2008) with VVB-confirmed additionality and a 15% buffer pool, but it is undermined by a 0% leakage deduction paired with an inconsistent 'quantified' justification, the absence of FPIC, seven material findings (including land-title and cartography gaps), and multiple cross-document contradictions in ERR figures and the crediting period. The project is functional but carries moderate data-reliability and safeguards risks.

Red Flags

  • Leakage deduction is 0% yet the justification is labelled 'quantified' in the May 2025 verification report while an earlier March 2025 verification report called it 'deemed negligible' — the two characterisations are mutually inconsistent and a truly quantified leakage figure should yield a non-zero deduction.
  • Free, Prior and Informed Consent (FPIC) was not conducted, a significant safeguard gap for a land-use project in Colombia involving community land.
  • Seven material findings were raised in the 2025 verification, including a Corrective Action Request for missing historical cartography and unresolved land-title issues on parcel 014-13629, indicating ongoing data-quality and legal-tenure concerns.
  • The crediting period differs between the PDD (2008-01-01 to 2035-12-31, 28 years) and the verification report (2008-05-01 to 2028-05-01, 20 years), creating ambiguity about the project's actual duration and the denominator for any pro-rata credit calculation.

Credit Vintages

IssuedRetiredAvailable
2008
2,94802,948
2009
1,81601,816
2016
1650165
2017
2130213
2018
3200320
2019
3200320
2020
3200320
2021
9650965
2022
2,54102,541
2023
1,96301,963
Total11,571011,571

Risk Indicators

Additionality

VVB-confirmed (Icontec)

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, inconsistent justification

Baseline

Project-specific, no reassessment date

Safeguards

Safeguards mentioned, FPIC not conducted

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents