Carmen del Darién (CDD) REDD+ Project
#66of 261 in Soil carbon#46of 124 in Colombia#582of 1339 in Verra (VCS)#5of 10 in VM0006
Audit Analysis
The Carmen del Darién REDD+ project meets core VCS requirements with VVB-verified additionality, a 20% quantified leakage deduction, and a 10% buffer pool, but is burdened by a project-specific baseline, a history of 41 nonconformity reports across VCS and CCB, and significant contextual risks in the Darién region (illegal armed groups, coca cultivation, ongoing disputes). The project delivered approximately 85% of its pro-rata ex-ante expectation for the 2018–2019 monitoring period, indicating no over-crediting, but the CCB public comment period was not conducted prior to verification and the project appears to have undergone a denial-and-reverification cycle.
Red Flags
- 31 VCS nonconformity reports and 10 CCB nonconformity reports were identified and closed during verification, indicating systemic documentation and calculation weaknesses
- The project did not undergo a CCB verification public comment period prior to verification; corrective actions require submitting a new public comment period request and uploading revised documents addressing reasons for denial
- Material findings include risks associated with the presence of illegal armed groups, ongoing disputes, and illegal coca production in the project area, raising questions about the durability of avoided deforestation
- Baseline is project-specific rather than jurisdictional, and the last baseline reassessment date is not stated in available documents
- FNRB value and method are not stated in any available document, leaving the forest net regeneration baseline unquantified in the extracted record
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 47,148 | 47,148 | 0 | |
| 2015 | 163,883 | 163,883 | 0 | |
| 2016 | 172,049 | 172,049 | 0 | |
| 2017 | 165,613 | 65,446 | 100,167 | |
| Total | 548,693 | 448,526 | 100,167 |
Risk Indicators
VVB-verified combined test
10% buffer, no reversals, but Darién context risks
20% quantified deduction
Project-specific, reassessment date not stated
FPIC and grievance present, but armed-group and dispute risks noted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →