Skip to main content
CCLand use (AFOLU)ColombiaGeneral Methodologyv2.1

Carvida

ECO-68 ↗

#7of 80 in ARR (afforestation)#29of 124 in Colombia#27of 99 in CerCarbono (CC)

5.4/ 10
Integrity
5.5
Transparency
5.5
Claim Safety
5.0
Documentation
6.0

Audit Analysis

Carvida is a large-scale (5,538 ha) Pinus/Eucalyptus plantation project in Colombia verified under the CerCarbono standard by Icontec. The project has a 15% buffer pool and VVB-confirmed additionality, but suffers from a project-specific baseline, contradictory leakage and reversal-event reporting between the monitoring and verification reports, a 15% discrepancy between claimed and verified ERR figures, and absent FPIC/grievance documentation. Fourteen findings (ten corrective actions) were raised in the third verification, with one land-restitution item still open.

Red Flags

  • ERR discrepancy of ~15% between the monitoring report (222,486 tCO2e) and the verification/issuance documents (189,114 tCO2e) indicates a material gap between project-side claims and VVB-verified figures
  • Leakage justification is contradictory: the verification report states 'quantified' while the monitoring report states 'deemed negligible', yet the deduction is 0% in both cases
  • No Free, Prior and Informed Consent (FPIC) or grievance mechanism is documented despite the project operating on 5,538 ha across four departments with community-adjacent land
  • One Safeguard Action (SAF 02) remains open regarding a land-restitution case for the La Samaria parcel, raising tenure-security risk
  • Additionality test type is not specified in any available document, limiting the ability to assess the robustness of the additionality claim

Credit Vintages

IssuedRetiredAvailable
2017
000
2018
404
2019
404
2020
1,21601,216
2021
10,157010,157
2022
10,157010,157
2023
10,222010,222
2024
1,61201,612
Total33,372033,372

Risk Indicators

Additionality

VVB-confirmed but test type unspecified

Permanence

15% buffer present; reversal documentation inconsistent

Leakage

0% deduction; justification contradictory across documents

Baseline

Project-specific; reassessment date not documented

Safeguards

Mentioned and benefit-sharing described; no FPIC or grievance mechanism

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents