Skip to main content
CDMN2OIranAM0028

Catalytic abatement of N2O in Nitric Acid Plant of Shiraz Petrochemical Company

CDM-8249 ↗

#1of 5 in Iran#455of 1459 in CDM (UNFCCC)

5.5/ 10
Integrity
5.5
Transparency
5.5
Claim Safety
6.0
Documentation
5.0

Audit Analysis

A CDM N2O abatement project in a nitric acid plant with VVB-confirmed additionality via an investment test, but undermined by nine corrective actions, multiple inter-document contradictions, and a project-specific modeled baseline. The project delivered roughly 76% of its pro-rata expected emissions reductions for the monitored period, which is conservative. Key gaps include absent FPIC documentation, no grievance mechanism, and unverified ERR figures.

Red Flags

  • Nine corrective actions were required at validation, including missing cost analysis for alternatives, unclear baseline scenario steps, and unaddressed stakeholder comments on a potentially financially attractive baseline (N2O-optimized gauzes)
  • Total ERR claimed differs by a factor of ~7.4 between the PDD (5,119,525 tCO2e lifetime) and the monitoring report (691,555 tCO2e for one monitoring period); while on different bases, the pro-rata delivery is only ~76% of expectation, and the verified ERR figure is not stated in available documents
  • No FPIC or grievance mechanism is documented despite safeguards being mentioned, and the project operates in Iran where independent stakeholder engagement may be constrained

Credit Vintages

IssuedRetiredAvailable
2020
783,1920783,192
Total783,1920783,192

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

no reversals reported but unconfirmed

Leakage

0% deduction, reasonable for N2O abatement

Baseline

Project-specific, modeled; doc contradiction

Safeguards

Mentioned but FPIC and grievance mechanism absent

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-27AM0028

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents