Catalytic N2O destruction project in the tail gas of the nitric acid plant PANNA 3 of Enaex S.A.

CDM-1229 ↗

#11of 31 in Chile#583of 1459 in CDM (UNFCCC)#2of 6 in ACM0019

5.3/ 10
Integrity
6.5
Transparency
4.0
Claim Safety
5.5
Documentation
4.5

Audit Analysis

A catalytic N2O destruction project at a Chilean nitric acid plant using the well-established ACM0019 methodology, validated by TÜV NORD CERT. The project type carries inherent permanence (no storage or reversal risk) and genuinely negligible leakage, but the absence of any monitoring data, a project-specific modeled baseline, and low extraction confidence limit confidence in the overall claim. All material findings from validation were minor and editorial in nature.

Red Flags

  • No monitoring reports or verified ERR figures found in the extracted record despite the crediting period starting in June 2022 — the project has been operational for approximately three years with no verifiable performance data available
  • Minimum extraction confidence is rated low, indicating at least one key document was poorly readable, which undermines confidence in the completeness of the extracted evidence
  • One of the four evidence documents is classified as 'unknown' type, creating uncertainty about the provenance and reliability of part of the documentation set

Credit Vintages

IssuedRetiredAvailable
2009
189,1000189,100
2010
1,010,02401,010,024
2011
1,251,43201,251,432
2012
769,4480769,448
2013
519,6110519,611
2015
681,0150681,015
2016
556,7440556,744
2018
1,210,23601,210,236
2019
690,5110690,511
2020
687,7460687,746
2021
739,7760739,776
Total8,305,64308,305,643

Risk Indicators

Additionality

Barrier test present; VVB confirmation not explicitly stated

Permanence

Avoidance project; no storage or reversal risk

Leakage

0% deduction; negligible for catalytic N2O destruction

Baseline

Project-specific modeled baseline; reassessed at project sta

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated; dual-channel risk unassess

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-27ACM0019

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents