Skip to main content
CCLand use (AFOLU)ColombiaGeneral Methodologyv2.1

Cavadacavᵾ Coreivᵾ Jocᵾ Bᵾcᵾro Rẽ, N̄ᵾjẽ N̄ecᵾvã Aiye Baquepe

ECO-118 ↗

#17of 80 in ARR (afforestation)#52of 124 in Colombia#43of 99 in CerCarbono (CC)

5.1/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
5.5
Documentation
4.0

Audit Analysis

A Colombian REDD+ project under the CerCarbono registry with a sound design (jurisdictional baseline, combined additionality test confirmed by the VVB, 9.5% buffer pool, no reversal events), but undermined by 10 Significant Audit Concerns, 30+ corrective actions, unresolved data contradictions across documents, and a 0% leakage deduction that was originally absent from the PDD. The project over-delivered relative to its ex-ante estimate on a pro-rata basis, which is a positive signal, but the volume of material findings and overlap issues with other registered projects create meaningful data-reliability risk.

Red Flags

  • 10 Significant Audit Concerns (SAC) identified by the VVB, including errors in project area, baseline emissions, projected emissions, and missing uncertainty estimation
  • Overlap with at least two other registered projects (AZIRPA and Verra VCS ID 3215, plus Cercarbono ID 67) identified during certification, resolved by area exclusion
  • Leakage deduction of 0% with a 'deemed negligible' justification, yet the PDD originally contained no leakage analysis at all (corrective action CAR 14)
  • Contradictory ex-ante lifetime ERR figures in two PDD versions (4,096,731 vs 6,645,107 tCO2e), a 39% discrepancy
  • Buffer pool percentage differs between the PDD (11%) and the monitoring report (9.5%), with no documented explanation for the change

Credit Vintages

IssuedRetiredAvailable
2018
1,89701,897
2019
5260526
2020
8030803
2021
1,09801,098
2022
1,40501,405
Total5,72905,729

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

Buffer 9.5%, no reversals, but permanence claim years not stated

Leakage

0% deduction, 'deemed negligible' but absent from original PDD

Baseline

Jurisdictional baseline, but last reassessment date not stated

Safeguards

FPIC, grievance mechanism, benefit sharing all documented

Double-claim

CORSIA and CCP status not stated; overlap with 2 other projects resolved

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents