A CDM biomass-energy project at a CEMEX cement plant in Costa Rica that substitutes fossil fuels with biomass residues. Additionality was confirmed by TÜV NORD CERT via a combined test, and the verified emissions reductions for the 2011–2012 monitoring period are broadly consistent with the pro-rata lifetime estimate. However, the project-specific baseline, a set of five corrective actions and eight non-material observations, and the absence of several key monitoring parameters in the extracted record limit confidence in the overall integrity and transparency of the credit.
Red Flags
- Five corrective actions were required at verification, including missing GHG emissions from on-site transportation and drying in the ER calculation and an outstanding Letter of Approval from Costa Rica
- The additionality discussion was flagged as unclear and the initial PDD used an invalid version of the additionality tool (NIR 5, NIR 6, NIR 7)
- Project-specific baseline with no jurisdictional or standardised reference, and no buffer pool or permanence mechanism in place
- Only one monitoring period (2011–2012) is documented out of a ten-year crediting period, leaving the remaining nine years unverified in the available record
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 58,931 | 0 | 58,931 | |
| 2013 | 40,279 | 0 | 40,279 | |
| Total | 99,210 | 0 | 99,210 |
Risk Indicators
VVB-confirmed but initial tool version invalid and discussio
Energy-substitution project; no reversal risk or events repo
Quantified per verification report but specific deduction va
Project-specific baseline; not yet due for reassessment unde
Safeguards and benefit-sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →