Ceran's Monte Claro Run of River Hydropower Plant CDM Project Activity
#1008of 1935 in Renewable energy#76of 211 in Brazil#740of 1459 in CDM (UNFCCC)#793of 1287 in ACM0002
Audit Analysis
A run-of-river hydro project in Brazil validated under CDM methodology ACM0002 v19 with a jurisdictional grid-emission-factor baseline and a 7-year crediting period. The project type carries inherently low reversal and leakage risk, and no material compliance issues were flagged by the VVB. However, the extracted record lacks explicit additionality documentation, monitoring-period data, and safeguards detail, limiting confidence in the full compliance picture.
Red Flags
- Additionality test type and VVB confirmation are not stated in the extracted record, leaving a core CDM requirement unverified in the available data
- Two contradictions exist between the validation report and an appendix regarding leakage treatment and baseline classification
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2007 | 135,689 | 0 | 135,689 | |
| 2008 | 174,467 | 0 | 174,467 | |
| 2009 | 111,986 | 0 | 111,986 | |
| 2010 | 133,679 | 0 | 133,679 | |
| 2011 | 197,816 | 0 | 197,816 | |
| 2013 | 103,210 | 0 | 103,210 | |
| 2023 | 572,163 | 0 | 572,163 | |
| Total | 1,429,010 | 0 | 1,429,010 |
Risk Indicators
Test type not stated in extracted record
Hydro infrastructure; no reversal events
0% deduction; negligible for hydro
Jurisdictional grid EF; reassessed 2019
Mentioned but no FPIC or grievance detail
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →