Cermikler 25.00 MW Hydroelectric Power Plant Project
#351of 1935 in Renewable energy#77of 295 in Turkey#176of 1339 in Verra (VCS)#260of 1287 in ACM0002
Audit Analysis
The Cermikler 25 MW hydro project is a fundamentally sound avoidance-type renewable energy project with VVB-confirmed additionality, no reversal events, and no material findings. However, a project-specific baseline, a grid emission factor discrepancy between the PDD and monitoring report, and a low extraction confidence across 11 documented contradictions introduce moderate uncertainty. The project delivered roughly 76% of its pro-rata ex-ante expectation for the elapsed monitoring period, indicating conservative rather than inflated crediting.
Red Flags
- Grid emission factor discrepancy: the PDD uses 0.4568 tCO2/MWh while the monitoring report (2025-02-07) uses 0.56 tCO2/MWh — a 23% difference that could affect credit calculations
- Baseline method contradiction: the verification report (2023) designates a project-specific baseline, while the monitoring report (2025) references a jurisdictional baseline — the methodology basis is unclear
- Min extraction confidence is rated low, and 11 contradictions were identified across documents, including internal inconsistencies within the same verification report on safeguards, FPIC, and grievance mechanism
- Five corrective actions were required by the VVB, including incomplete project description sections and unclarified compliance with local/national legal frameworks
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 46,060 | 46,060 | 0 | |
| 2015 | 1,912 | 0 | 1,912 | |
| 2016 | 34,959 | 0 | 34,959 | |
| 2017 | 16,989 | 0 | 16,989 | |
| 2018 | 18,589 | 486 | 18,103 | |
| 2019 | 29,731 | 0 | 29,731 | |
| 2020 | 29,482 | 29,482 | 0 | |
| 2021 | 12,855 | 10,937 | 1,918 | |
| 2022 | 20,978 | 0 | 20,978 | |
| 2023 | 26,165 | 4,070 | 22,095 | |
| Total | 237,720 | 91,035 | 146,685 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversals
0% deduction, quantified justification
Project-specific, method contradiction
FPIC and grievance noted but contradictory
CORSIA not eligible, CCP not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →