Skip to main content
CDMHydroBrazilACM0002

CERTEL – Cooperativa Regional de Eletrificação Teutônia Ltda - Small Hydropower Plants

CDM-2375 ↗

#129of 1935 in Renewable energy#4of 211 in Brazil#77of 1459 in CDM (UNFCCC)#92of 1287 in ACM0002

6.5/ 10
Integrity
6.5
Transparency
6.0
Claim Safety
7.0
Documentation
6.5

Audit Analysis

A CDM small-hydropower project in Brazil with a solid combined additionality test confirmed by RINA Services and a jurisdictional grid-based baseline. The project significantly under-delivered relative to its ex-ante estimate (approximately 30% of claimed credits), which is conservative for claim safety, but a notable discrepancy in the grid emission factor between the PDD and an appendix document introduces uncertainty into the credit calculation. Four corrective action requests were raised during verification but deemed immaterial by Brazilian regulators.

Red Flags

  • Grid emission factor differs by ~75% between the PDD (0.2654 tCO2/MWh) and an appendix document (0.460 tCO2/MWh); the basis for the credit calculation is unclear
  • Verified emissions reductions (43,794 tCO2e) are only ~30% of the ex-ante estimate (143,827 tCO2e) over the same 7-year period, raising questions about the accuracy of the original PDD assumptions
  • Financial additionality analysis used data from a 2001 reference plant rather than the actual decision year for each plant (CAR 2 in the verification report)

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Combined test confirmed by VVB

Permanence

Avoidance project, no reversal risk

Leakage

0% deduction, justification inconsistent across docs

Baseline

Jurisdictional but grid EF contradicted

Safeguards

Mentioned but details not extracted

Double-claim

CCP and CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-27ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.