CGN Anqiu Chengdingshan Wind Farm Project
#1221of 1935 in Renewable energy#710of 1084 in China#944of 1459 in CDM (UNFCCC)#945of 1287 in ACM0002
Audit Analysis
A CDM wind project in China with a strong jurisdictional baseline and reasonable leakage treatment, but notable gaps in the extracted record regarding additionality documentation, monitoring parameters, and safeguards detail. The ERR figure discrepancy between documents is likely a scope difference (annual vs. full crediting period) rather than a true contradiction, but it reduces confidence in data consistency.
Red Flags
- Additionality test type and VVB confirmation are not explicitly stated in the extracted record, leaving the additionality assessment undocumented in available sources
- Monitoring period, FNRB method, and usage monitoring method are all absent from the extracted data, limiting verifiability of claimed emissions reductions
- FPIC and grievance mechanism are not documented in the available record despite safeguards being mentioned
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Test type not stated in record
Avoidance project, no reversal risk
Negligible, justified for wind
Jurisdictional, reassessed 2020
Mentioned but FPIC/grievance not documented
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →