CGN Dunhuang 10MW Grid-connected Solar PV Power Generation Project
#581of 1935 in Renewable energy#275of 1084 in China#389of 1459 in CDM (UNFCCC)#197of 806 in AMS-I.D
Audit Analysis
A straightforward 10 MW grid-connected solar PV project in China with a jurisdictional baseline and VVB-confirmed additionality, but limited documentation (no verification or monitoring reports in the extracted record) and several key MRV parameters left unstated. The project is low-risk in design but the evidence base is thin, limiting confidence in the claimed 96,936 tCO₂e.
Red Flags
- No verification or monitoring report found in the extracted record; the ERR figure of 96,936 tCO₂e appears only in the validation report, so independent verification of actual generation is not evidenced
- Monitoring period, fnrb value, and usage monitoring method are all unstated, leaving the MRV chain incomplete
- Contradiction between the validation report (leakage 'deemed negligible') and an appendix (leakage 'quantified') creates ambiguity about whether a quantitative leakage assessment was actually performed
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed (CTC)
low inherent risk for solar
0% deduction, justified as negligible for grid feed-in
Jurisdictional grid EF (0.7674, 2017), reassessed 2019
Mentioned but FPIC and grievance mechanism not detailed
CCP and CORSIA status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →