Skip to main content
CDMWindChinaACM0002

CGN Guangdong Duanfen Wind Power Project

CDM-5136 ↗

#831of 1935 in Renewable energy#421of 1084 in China#582of 1459 in CDM (UNFCCC)#645of 1287 in ACM0002

5.3/ 10
Integrity
5.0
Transparency
5.0
Claim Safety
6.0
Documentation
5.5

Audit Analysis

A CDM wind power project in Guangdong, China, validated by CTC in 2020 using a jurisdictional baseline and ACM0002 methodology. The project presents low inherent risk (wind generation, negligible leakage, no reversal events), but the extracted record lacks explicit additionality test documentation, monitoring data, and CORSIA/CCP eligibility status, limiting confidence in full claim verification.

Red Flags

  • Additionality test type and VVB confirmation of additionality are not stated in the extracted record, despite being a mandatory CDM validation element
  • No monitoring report or monitoring period is available in the evidence set, so actual credit delivery cannot be verified against the 400,120 tCO2e ex-ante estimate
  • CORSIA eligibility and CCP status are not stated, leaving dual-channel or double-claiming risk unassessed

Credit Vintages

IssuedRetiredAvailable
2020
378,4170378,417
Total378,4170378,417

Risk Indicators

Additionality

VVB identified but test type not stated in record

Permanence

Wind generation — no inherent reversal risk

Leakage

0% deemed negligible — appropriate for wind

Baseline

Jurisdictional baseline, reassessed 2020

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated — dual-channel risk unasses

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-27ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents