CGN Inner Mongolia Duerbote Wind farm Project
#660of 1935 in Renewable energy#314of 1084 in China#451of 1459 in CDM (UNFCCC)#508of 1287 in ACM0002
Audit Analysis
A CDM wind energy project in Inner Mongolia, China, with a reasonable grid-emission-factor baseline and appropriate leakage treatment, but notable gaps in additionality documentation and a baseline-method contradiction between the validation and monitoring reports. The project delivered roughly 91% of its pro-rata ex-ante expectation over the monitoring period, consistent with normal wind variability. No reversal events or corrective actions were reported.
Red Flags
- Additionality test type and VVB confirmation are not stated in any extracted document, leaving the additionality claim unverified in the available record
- Baseline method is described as 'project' in the monitoring report (2021) but 'jurisdictional' in the validation report (2019) — an unresolved inconsistency that could affect baseline credibility
- Total verified ERR figure is not found in the extracted record, preventing independent cross-check of the 383,354 tCO2e claimed in the monitoring report
- FPIC and grievance mechanism details are absent from the available documents despite safeguards being mentioned
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 105,381 | 0 | 105,381 | |
| 2012 | 197,237 | 0 | 197,237 | |
| 2021 | 388,156 | 0 | 388,156 | |
| 2022 | 383,354 | 0 | 383,354 | |
| Total | 1,074,128 | 0 | 1,074,128 |
Risk Indicators
Test type and VVB confirmation not stated in available docum
Avoidance project; no reversal events; no storage risk
0% deduction; deemed negligible; appropriate for grid-displa
Grid EF 0.84045 (2017); method contradicted between document
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →