Skip to main content
CDMSolarChinaAMS-I.D

CGN Ningxia Qingtongxia Phase I 10MWp Grid-connected Solar PV Power Generation Project

CDM-5712 ↗

#920of 1935 in Renewable energy#481of 1084 in China#659of 1459 in CDM (UNFCCC)#306of 806 in AMS-I.D

5.2/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
6.0
Documentation
5.5

Audit Analysis

A 10 MWp grid-connected solar PV project in China validated under CDM methodology AMS-I.D. v18.0 with a jurisdictional baseline and no material findings. The primary concern is the absence of an explicitly stated additionality test type and VVB confirmation in the extracted record, alongside a minor contradiction in how leakage was characterised between the validation report and its appendix. Overall the project presents a low inherent risk profile for a solar PV avoidance project, but documentation gaps limit confidence.

Red Flags

  • Additionality test type and VVB confirmation are not stated in the extracted record, leaving the additionality assessment unverified in the available data
  • Contradiction between the validation report (leakage 'deemed negligible') and the appendix (leakage 'quantified') creates ambiguity in the leakage treatment
  • CORSIA eligibility and CCP status are not stated, leaving dual-channel risk unassessed

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Test type and VVB confirmation not stated in extracted recor

Permanence

Avoidance project; no reversal risk or events reported

Leakage

0% deduction; minor contradiction in justification wording

Baseline

Jurisdictional baseline, 2017 grid EF, reassessed at project

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated; dual-channel risk unassess

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-27AMS-I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents