CGN Qinghai Xitieshan Phase I 10MW Grid-connected Solar PV Power Generation Project
#1006of 1935 in Renewable energy#549of 1084 in China#737of 1459 in CDM (UNFCCC)#325of 806 in AMS-I.D
Audit Analysis
A 10 MW grid-connected solar PV project in Qinghai, China, registered under CDM with a jurisdictional baseline and a 7-year crediting period. The project shows no material findings, no corrective actions, and a reasonable 0% leakage deduction for a grid-connected generation asset. However, several key integrity and transparency indicators — additionality test type, FNRB method, usage monitoring, and CORSIA/CCP status — are absent from the extracted record, limiting confidence in the full compliance picture.
Red Flags
- Additionality test type and VVB confirmation are not stated in any extracted document, a fundamental CDM requirement; the project's CDM registration implies it was assessed, but the evidence is not visible in the available record.
- FNRB method and value are not stated, leaving the grid emission factor application (0.7674 tCO₂/MWh, 2017) unanchored to a documented calculation methodology.
- One of the four evidence documents is listed as 'unknown,' reducing confidence in the completeness of the documentation set.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Test not stated in extracted record; CDM registration implie
Grid-connected solar PV; no inherent reversal risk; no rever
0% deduction with negligible justification; consistent with
Jurisdictional baseline, grid EF 0.7674 (2017), reassessed 2
Safeguards mentioned and benefit sharing described; FPIC and
CORSIA eligibility and CCP status both not stated; dual-chan
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →