CGN Xiangshan Tuci Wind Power Project
#1300of 1935 in Renewable energy#783of 1084 in China#1024of 1459 in CDM (UNFCCC)#1010of 1287 in ACM0002
Audit Analysis
A CDM wind power project in China with a jurisdictional grid baseline and appropriate leakage treatment, but significant gaps in the extracted record: additionality verification is not confirmed, monitoring period is unstated, and extraction confidence is low. The ERR figures in the PDD and validation report are consistent on a pro-rata basis (42,501 tCO₂/yr × 7 years ≈ 297,507 tCO₂ lifetime), but the absence of a stated additionality test and low document readability limit confidence in the project's additionality claim.
Red Flags
- Additionality test type and VVB confirmation are not stated in the extracted record; the validation report (2020) does not explicitly confirm the additionality assessment in the available data
- Minimum extraction confidence is rated low, meaning at least one key document was poorly readable and critical details may be missing
- One material finding (CL 1) flagged that project implementation status needed clarification in the updated PDD
- CORSIA and CCP eligibility status are not stated in any available document
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Test type and VVB confirmation not found in extracted data
Avoidance project; no reversal events reported
0% deemed negligible; appropriate for grid-connected wind
Jurisdictional grid EF; reassessed 2020
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →