Chacabuquito Hydroelectric Power Project
#1303of 1935 in Renewable energy#18of 31 in Chile#1026of 1459 in CDM (UNFCCC)
Audit Analysis
The Chacabuquito hydroelectric project in Chile is a standard grid-displacement avoidance project with a jurisdictional baseline and a combined additionality test, but the extracted record is thin: only a validation report and PDD are available, extraction confidence is low, and four material findings (including one corrective action for an incorrect fuel conversion factor) were raised. The identical claimed and verified ERR figures, combined with the absence of a stated monitoring period, buffer pool, or CORSIA/CCP status, limit confidence in the project's long-term claim integrity.
Red Flags
- Min extraction confidence is low, indicating at least one key document was poorly readable, reducing reliability of all extracted facts
- Four material findings at validation, including a corrective action for an incorrect gaseous-fuel conversion factor in the emission-factor calculation
- Crediting period dates contradict between the validation report (2018-11-04 to 2025-11-03) and another source (2018-04-11 to 2025-03-11)
- No verification or monitoring report is present in the extracted record; only the validation report (2018) and PDD are available
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 329,164 | 0 | 329,164 | |
| 2014 | 267,673 | 0 | 267,673 | |
| 2015 | 55,927 | 0 | 55,927 | |
| 2022 | 228,595 | 0 | 228,595 | |
| Total | 881,359 | 0 | 881,359 |
Risk Indicators
Combined test present; VVB confirmation not captured in extr
Hydro avoidance (low inherent risk)
0% deduction, deemed negligible—consistent with grid-displac
Jurisdictional baseline, reassessed 2018
Safeguards and benefit-sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →