Vai al contenuto principale
VCS Agriculture Forestry and Other Land Use United States Registry: Registered Documentazione completa General Methodology v2.0

Chestnut Carbon Conservation Project

VCS-3814 ↗

6.3 / 10
Integrity
6.1
Transparency
6.4
Claim Safety
5.6
Documentation
7.6

Score Breakdown

Integrity

verified The monitoring report (2023) reports no reversal events and shows a 15% buffer pool contribution.

missing Leakage is not addressed in the monitoring report (2023) and the leakage deduction is not found in the extracted record, despite the PDD (2022) indicating leakage was quantified.

Transparency

verified The VVB is identified as AENOR and the monitoring period is clearly stated (2022-07-05 to 2023-01-31) in the monitoring report (2023).

missing Verified and claimed ER totals are not found in the extracted record, limiting the ability to reconcile issuance with monitoring.

Claim Safety

verified A buffer pool contribution of 15% (monitoring report, 2023) reduces non-permanence risk relative to having no buffer.

missing CORSIA eligibility and CCP status are not stated in available documents, and leakage handling is inconsistent across documents, increasing greenwashing/over-crediting risk.

Documentation

verified Multiple core documents are present (PDD, validation report, monitoring report, issuance) and extraction confidence is high.

missing Contradictions across documents on key fields (additionality test type, leakage justification, crediting period, reversals) indicate documentation quality/control issues.

Detailed Analysis

Integrity

The monitoring report (2023) indicates no reversal events and shows a 15% buffer pool contribution, which supports permanence management for an AFOLU project. Additionality is stated as confirmed by the VVB, with the monitoring report (2023) describing a common practice test. Integrity is weakened because leakage is shown as not addressed in the monitoring report (2023) and the leakage deduction is not found in the extracted record, while the PDD (2022) indicates leakage was quantified—this inconsistency raises over-crediting risk.

Transparency

The monitoring report (2023) clearly states the monitoring period (2022-07-05 to 2023-01-31) and identifies the VVB as AENOR, which supports traceability. Safeguards elements (FPIC and a grievance mechanism) are indicated in the extracted record, suggesting some non-carbon transparency. However, the total emissions reductions/removals claimed and verified are not found in the extracted record, limiting independent reconciliation of monitoring results to issuance.

Claim Safety

Claim safety is moderated by uncertainty around eligibility and market claims: CORSIA eligibility and CCP status are not stated in available documents. The baseline is project-specific (as indicated in the extracted record), which generally carries higher over-crediting risk than standardized/jurisdictional baselines unless well-justified and frequently reassessed (reassessment timing is not found). The leakage inconsistency between the PDD (2022) and monitoring report (2023) further increases the risk that credited removals could be overstated.

Documentation

The evidence set includes key document types (PDD, validation report, monitoring report, issuance) and the extraction confidence is high, supporting a solid documentation score. No material findings or corrective actions are reported in the extracted record, which is a positive signal for audit outcomes. Nonetheless, multiple internal inconsistencies across documents on fundamental fields (additionality test type, leakage justification, crediting period, and reversal reporting) indicate document control issues that reduce reliability.

Overall

I privileged the monitoring report (2023-11-28) over the PDD where conflicts exist because it is the later-stage MRV document intended to reflect implemented monitoring and current project status. Specifically: for reversals, I used “none reported” from the monitoring report rather than “not addressed” in the PDD; for additionality test type, I used “common practice” from the monitoring report but treated the conflict with the PDD’s “investment test” as a reliability penalty; for leakage, I treated the monitoring report’s “not addressed” as the operative weakness despite the PDD claiming quantification; and for the crediting period, I used the monitoring report dates but downgraded confidence due to the mismatch. These contradictions collectively reduce confidence in data reliability and increase perceived over-crediting risk, pulling down integrity and claim-safety scores.

Audit Analysis

This VCS AFOLU soil carbon project shows some core integrity elements (VVB-confirmed additionality, buffer pool contribution, and no reported reversals in the monitoring report). However, key risk controls are weakened by inconsistencies between the PDD and monitoring report—especially around leakage treatment and the additionality test type—creating over-crediting and reliability concerns.

Project Description

Proponent: Forest Carbon Works PBC Protocol categories: Agriculture Forestry and Other Land Use Protocols: VM0003 Estimated annual GHG reductions: 221312 tCO2e Region: North America Registration date: 2023-12-15

Red Flags

  • Leakage treatment is inconsistent: the PDD indicates leakage was quantified, but the monitoring report says leakage was not addressed.
  • Additionality test type conflicts between documents (investment test in the PDD vs common practice in the monitoring report), reducing confidence in the additionality narrative.
  • Crediting period dates differ between the PDD and monitoring report, indicating basic project metadata inconsistency.

Credit Vintages

Issued Retired Available
2022
1,464 0 1,464
2023
400 0 400
Total 1,864 0 1,864

Cosa migliorerebbe questo punteggio

  • Publish a clear leakage section in the monitoring/verification package that reconciles the PDD’s quantified leakage approach with the monitoring report, including the applied leakage deduction (if any) and justification.
  • Provide a transparent ER reconciliation table linking monitored results to issuance (claimed vs verified totals, vintage, and any deductions), and correct inconsistent project metadata (crediting period dates and additionality test description) across documents.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed, but test type inconsistent across documents

Permanence

Buffer pool (15%) and no reversals reported

Leakage

Leakage not addressed in monitoring; inconsistent with PDD

Baseline

Project-specific baseline; reassessment timing not stated

Safeguards

FPIC and grievance mechanism documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-07 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti