Chestnut Carbon Conservation Project
#22of 261 in Soil carbon#89of 345 in United States#254of 1339 in Verra (VCS)#2of 5 in VM0003
Audit Analysis
The Chestnut Carbon Conservation Project is a VCS ALM soil-carbon project in the US with a VVB-confirmed investment additionality test, a 15% buffer pool, and a 20% quantified leakage deduction. However, significant contradictions between the PDD and validation/verification reports (leakage 0.2% vs 20%, additionality test type, ERR figures) and a project-specific baseline reduce confidence. The first monitoring period delivered 85% of its period-specific ex-ante estimate, which is reasonable for a nascent soil-carbon project, but the lifetime pro-rata delivery is only ~1.4%, reflecting the slow build-up typical of soil sequestration.
Red Flags
- Leakage deduction contradicts between documents: the validation report states 20% while the PDD states 0.2% — a 100× discrepancy that undermines confidence in the leakage treatment
- Additionality test type is inconsistent: the validation report confirms an investment test while the PDD describes a combined test; the VVB-confirmed investment test is privileged but the discrepancy is unexplained
- Material findings reveal that ex-ante and ex-post removal figures were initially inconsistent across PD/MR sections, the buffer reserve calculation was initially incorrect, and the Non-Permanence Risk Report lacked justifications — all corrected but indicative of initial documentation weakness
- FPIC was not conducted, which is a gap for a project in the US where indigenous land rights may be relevant
- Low extraction confidence across the document set limits the reliability of the structured data used for scoring
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 1,464 | 0 | 1,464 | |
| 2023 | 400 | 0 | 400 | |
| Total | 1,864 | 0 | 1,864 |
Risk Indicators
VVB-confirmed investment test
15% buffer, no reversals
20% deduction but PDD conflict
Project-specific, not yet due for reassessment
Grievance present, FPIC not conducted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →