Skip to main content
VCSAgriculture Forestry and Other Land UseUnited States Registry: RegisteredVM0003

Chestnut Carbon Conservation Project

VCS-3814 ↗

#22of 261 in Soil carbon#89of 345 in United States#254of 1339 in Verra (VCS)#2of 5 in VM0003

5.8/ 10
Integrity
6.5
Transparency
5.5
Claim Safety
5.5
Documentation
5.5

Audit Analysis

The Chestnut Carbon Conservation Project is a VCS ALM soil-carbon project in the US with a VVB-confirmed investment additionality test, a 15% buffer pool, and a 20% quantified leakage deduction. However, significant contradictions between the PDD and validation/verification reports (leakage 0.2% vs 20%, additionality test type, ERR figures) and a project-specific baseline reduce confidence. The first monitoring period delivered 85% of its period-specific ex-ante estimate, which is reasonable for a nascent soil-carbon project, but the lifetime pro-rata delivery is only ~1.4%, reflecting the slow build-up typical of soil sequestration.

Red Flags

  • Leakage deduction contradicts between documents: the validation report states 20% while the PDD states 0.2% — a 100× discrepancy that undermines confidence in the leakage treatment
  • Additionality test type is inconsistent: the validation report confirms an investment test while the PDD describes a combined test; the VVB-confirmed investment test is privileged but the discrepancy is unexplained
  • Material findings reveal that ex-ante and ex-post removal figures were initially inconsistent across PD/MR sections, the buffer reserve calculation was initially incorrect, and the Non-Permanence Risk Report lacked justifications — all corrected but indicative of initial documentation weakness
  • FPIC was not conducted, which is a gap for a project in the US where indigenous land rights may be relevant
  • Low extraction confidence across the document set limits the reliability of the structured data used for scoring

Credit Vintages

IssuedRetiredAvailable
2022
1,46401,464
2023
4000400
Total1,86401,864

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

15% buffer, no reversals

Leakage

20% deduction but PDD conflict

Baseline

Project-specific, not yet due for reassessment

Safeguards

Grievance present, FPIC not conducted

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02VM0003

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents