China Hunan Yuzitang Small Hydropower Project
#927of 1935 in Renewable energy#487of 1084 in China#664of 1459 in CDM (UNFCCC)#309of 806 in AMS-I.D
Audit Analysis
A straightforward small hydropower project under CDM using the standard AMS-I.D methodology with a jurisdictional grid baseline. The project shows no over-crediting (claimed and verified ERRs are identical at 90,230 tCO₂e) and no reversal or leakage concerns, but key additionality details and monitoring-period data were not captured in the extracted record, limiting confidence in the full MRV chain.
Red Flags
- Additionality test type and VVB confirmation are not stated in the extracted record, leaving a gap in verifying a core CDM requirement
- No monitoring report appears in the evidence document list, and the monitoring period is not stated, making it impossible to confirm periodic MRV compliance
- A contradiction exists between the validation report (leakage deemed negligible) and an undated appendix (leakage not addressed), indicating inconsistent documentation
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 47,057 | 0 | 47,057 | |
| 2013 | 28,327 | 0 | 28,327 | |
| Total | 75,384 | 0 | 75,384 |
Risk Indicators
Test type not stated in record
Hydro asset – no reversal risk
0% – negligible for grid hydro
Jurisdictional grid EF, reassessed 2019
Mentioned but FPIC/grievance not detailed
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →