China Resources New Energy Lianzhou Yanxi 49.8MW Wind Power Project
#1225of 1935 in Renewable energy#712of 1084 in China#947of 1459 in CDM (UNFCCC)#948of 1287 in ACM0002
Audit Analysis
A 49.8 MW onshore wind project under CDM with a confirmed combined additionality test and jurisdictional baseline, but the record is undermined by a seven-fold discrepancy in claimed emissions reductions between the PDD and the validation report, the absence of any monitoring-period data, and a low extraction confidence across nine source documents. The project is a standard grid-displacement wind scheme with negligible leakage, yet the data reliability issues and missing verification trail prevent a higher confidence rating.
Red Flags
- Total ERR claimed differs by a factor of ~7 between the PDD (571,046 tCO₂e) and the validation report (81,578 tCO₂e); the basis for each figure is not clarified in the extracted record
- No monitoring-period data or verified ERR figures are present in any available document, leaving actual delivery unassessable
- Baseline method is stated as 'jurisdictional' in the validation report but 'project' in the PDD, creating ambiguity about the actual baseline construction
- Low extraction confidence across the document set means key fields (buffer pool, reversal events, monitoring method, CORSIA/CCP status) could not be confirmed
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Combined test confirmed by VVB
Grid-displacement wind; no reversal risk
0% deduction; negligible for wind
Jurisdictional per VVB; PDD says project-specific
Safeguards mentioned; FPIC and grievance not confirmed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →