China Yongzhou Xiangqi Hydropower Project
#105of 1935 in Renewable energy#25of 1084 in China#60of 1459 in CDM (UNFCCC)#74of 1287 in ACM0002
Audit Analysis
A CDM hydro project with a well-established methodology (ACM0002 v13), VVB-confirmed combined additionality test, and a jurisdictional baseline. The project is an avoidance-type (displacing grid electricity), so permanence risk is inherently low. Main gaps are the absence of a verified ERR figure, unstated CORSIA/CCP status, and a minor discrepancy between two monitoring reports that is most likely attributable to different hydro generation periods.
Red Flags
- Total ERR verified figure is not stated in the extracted record, preventing independent confirmation of the 224,308 tCO₂e claimed in the 2016 monitoring report
- Two monitoring reports show different claimed ERR values (290,434 in the July 2015 report vs 224,308 in the April 2016 report); while likely reflecting different hydro generation periods, the discrepancy was not explicitly reconciled in the documents
- CORSIA eligibility and CCP status are not stated, leaving dual-channel risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 26,091 | 0 | 26,091 | |
| 2014 | 228,120 | 0 | 228,120 | |
| 2015 | 290,426 | 0 | 290,426 | |
| 2016 | 224,308 | 0 | 224,308 | |
| Total | 768,945 | 0 | 768,945 |
Risk Indicators
Combined test, VVB-confirmed
Avoidance project, no reversal risk
Negligible, justified for grid-connected hydro
Jurisdictional, standard CDM grid EF
Grievance & benefit sharing present; FPIC not stated
CORSIA & CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →