China Yongzhou Xiangqi Hydropower Project

CDM-8164 ↗

#105of 1935 in Renewable energy#25of 1084 in China#60of 1459 in CDM (UNFCCC)#74of 1287 in ACM0002

6.6/ 10
Integrity
7.0
Transparency
6.0
Claim Safety
6.5
Documentation
7.0

Audit Analysis

A CDM hydro project with a well-established methodology (ACM0002 v13), VVB-confirmed combined additionality test, and a jurisdictional baseline. The project is an avoidance-type (displacing grid electricity), so permanence risk is inherently low. Main gaps are the absence of a verified ERR figure, unstated CORSIA/CCP status, and a minor discrepancy between two monitoring reports that is most likely attributable to different hydro generation periods.

Red Flags

  • Total ERR verified figure is not stated in the extracted record, preventing independent confirmation of the 224,308 tCO₂e claimed in the 2016 monitoring report
  • Two monitoring reports show different claimed ERR values (290,434 in the July 2015 report vs 224,308 in the April 2016 report); while likely reflecting different hydro generation periods, the discrepancy was not explicitly reconciled in the documents
  • CORSIA eligibility and CCP status are not stated, leaving dual-channel risk unassessed

Credit Vintages

IssuedRetiredAvailable
2013
26,091026,091
2014
228,1200228,120
2015
290,4260290,426
2016
224,3080224,308
Total768,9450768,945

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

Avoidance project, no reversal risk

Leakage

Negligible, justified for grid-connected hydro

Baseline

Jurisdictional, standard CDM grid EF

Safeguards

Grievance & benefit sharing present; FPIC not stated

Double-claim

CORSIA & CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-27ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.