Chol Charoen Group Wastewater Treatment with Biogas System I (Cholburi)

VCS-430 ↗

#181of 268 in Biogas#36of 48 in Thailand#1034of 1339 in Verra (VCS)#36of 55 in AMS-III.H

4.4/ 10
Integrity
4.5
Transparency
4.0
Claim Safety
5.0
Documentation
4.0

Audit Analysis

A long-running Thai wastewater-to-biogas project with VVB-confirmed additionality and a reasonable pro-rata delivery rate (87% of expectation), but plagued by chronic MRV weaknesses including repeated calibration gaps, missing monitoring data, and dozens of corrective actions across multiple verification cycles. The project-specific modeled baseline, absence of FPIC, and low document extraction confidence further erode confidence in the credit quality.

Red Flags

  • Dozens of material findings and corrective actions across multiple verification periods (2009–2025), including recurring calibration gaps for COD analyzers, flow meters, and weighbridges, indicating systemic MRV weaknesses
  • FPIC was not conducted and benefit sharing is not described in the most recent (2025) verification report, despite a grievance mechanism being in place
  • Low extraction confidence across the document set, meaning at least one key document was poorly readable, reducing assurance in the extracted data
  • Boiler 2 (outside project boundary) was used during Boiler 1 downtime, and Generator 5 replaced Generator 4 with reduced capacity — operational changes that complicate baseline and emission accounting

Credit Vintages

IssuedRetiredAvailable
2007
11,05611,0560
2008
13,65413,6540
2009
19,88819,8880
2010
40,46440,4640
2011
43,76543,7650
2012
71,47671,4760
2013
44,32143,1131,208
2014
45,56045,5600
2015
42,00042,0000
2016
33,44133,4410
2017
29,79629,7960
2018
48,06148,0610
2019
59,80059,8000
2020
45,94745,9470
2021
11,9984,2927,706
Total561,227552,3138,914

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

0% deemed negligible, plausible for biogas

Baseline

Project-specific modeled, reassessed 2018

Safeguards

Grievance present, FPIC not conducted

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-09AMS-III.H v18.0, AMS-I.C v20.0, AMS-I.D v18.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents