Chongqing Youyang County Youchou Hydropower Station Project
#1226of 1935 in Renewable energy#713of 1084 in China#948of 1459 in CDM (UNFCCC)#949of 1287 in ACM0002
Audit Analysis
A small CDM hydro project in Chongqing, China, with a jurisdictional baseline and a VVB-verified emission reduction figure of 178,912 tCO₂e over a 7-year crediting period. The project is undermined by a major discrepancy between the PDD's claimed 1,252,384 tCO₂e and the VVB-verified figure, contradictory leakage justifications across documents, and the absence of stated additionality test details in the extracted record. Overall, the project shows moderate integrity with notable documentation and claim-safety concerns.
Red Flags
- Major ERR discrepancy: the PDD (2019-08-20) claims 1,252,384 tCO₂e while the validation report (2019-08-25) and monitoring report (2019-08-15) both state 178,912 tCO₂e — a roughly 7-fold difference that is not explained in the extracted record
- Leakage justification is contradictory: the monitoring report (2019-08-15) records leakage as 'not addressed' while the validation report (2019-08-25) states it was 'deemed negligible', with a 0% deduction applied in both cases
- Additionality test type and VVB confirmation are not stated in the extracted documents, leaving a gap in the core CDM additionality requirement
- PDD form version 10.1 was used instead of the required version 11.0, flagged as a material finding with a corrective action to update
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Test type not stated in extracted documents
Hydro project, no reversal events
0% deduction, contradictory justification
Jurisdictional, reassessed 2019
Mentioned, FPIC and grievance not stated
CCP and CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →