Vai al contenuto principale
VCS avoidance Brazil Vintage 2007 Registry: Registered Documentazione completa General Methodology v2.0

CIKEL BRAZILIAN AMAZON REDD PROJECT AVOIDING PLANNED DEFORESTATION

VCS-832 ↗

6.2 / 10
Integrity
6.1
Transparency
6.4
Claim Safety
5.6
Documentation
7.2

Score Breakdown

Integrity

verified The monitoring documentation indicates additionality was confirmed by the VVB using an investment test, and no material findings or corrective actions are listed.

missing Permanence and volume integrity are weakened by contradictions on buffer contribution and reversal occurrence, and the baseline reassessment timing is not stated in the extracted record.

Transparency

verified The project identifies the VVB (Earthood Services Private Limited) and provides a clear monitoring period (2007-07-19 to 2017-07-18) with a quantified verified ER figure reported in the extracted record.

missing Key MRV/registry clarity gaps remain because the claimed ER total is not found in the extracted record and the verified ER total is contradictory across documents.

Claim Safety

verified A buffer contribution is reported and reversals are described as eligible for buffer release in the monitoring documentation, which can support conservative claims when consistently documented.

missing CORSIA and CCP status are not stated in the extracted record, and contradictions in verified ERs and reversal reporting elevate greenwashing/over-crediting risk.

Documentation

verified A relatively large document set was used (18) including PDD, monitoring report, validation report, issuance, and extraction confidence is high.

missing Several critical fields are missing or inconsistent across documents (leakage deduction percent, baseline reassessment date, safeguards/FPIC/grievance consistency), reducing documentation reliability.

Detailed Analysis

Integrity

The monitoring documentation indicates additionality was confirmed by the VVB using an investment test, and the extracted record lists no material findings or corrective actions. A buffer contribution is reported (15.5%), and reversals are described as none reported with eligibility for buffer release, but both buffer percentage and reversal occurrence are contradicted elsewhere. Leakage is described as quantified, yet the actual leakage deduction percentage is not found in the extracted record, and the baseline is project-specific with no stated reassessment date, which weakens baseline robustness.

Transparency

The extracted record provides the VVB name (Earthood Services Private Limited) and a defined monitoring period (2007-07-19 to 2017-07-18), supporting basic traceability. However, the total claimed ERs are not found in the extracted record, and the verified ER total is inconsistent across documents, reducing MRV clarity. Several operational monitoring fields (such as usage monitoring) are not applicable or not found, which is acceptable for REDD+ in parts but still leaves gaps for readers trying to reconcile volumes.

Claim Safety

Because the baseline is project-specific and the baseline reassessment timing is not stated in the extracted record, there is residual over-crediting risk typical of APD projects if baseline assumptions drift over time. The project’s CORSIA eligibility and CCP status are not stated in the extracted record, so buyers cannot easily assess cross-eligibility and claims constraints. Contradictory verified ER totals and reversal reporting increase the risk that public claims could be challenged or misinterpreted.

Documentation

The evidence set is relatively complete in type (PDD, monitoring report, validation report, issuance) with 18 documents used and high extraction confidence, which supports a solid documentation score. Nonetheless, multiple key facts conflict across documents (buffer percentage, reversals, safeguards/FPIC/grievance, crediting period, and verified ER totals), indicating record-management or version-control issues. Missing quantified items (like leakage deduction percent and baseline reassessment date) further reduce completeness for quality assessment.

Overall

Key contradictions materially affect confidence: for buffer contribution, the monitoring report value (15.5%, dated 2012-05-18) is privileged over the validation report value (10%, dated 2023-07-27) because buffer contributions are typically determined/updated through VCS AFOLU risk assessment and monitoring/verification context, but the inconsistency still lowers integrity. For reversals, the more conservative interpretation is that reversals may have been reported (2023-12-12 unknown source) despite an earlier monitoring report stating none; this uncertainty reduces permanence confidence. For verified ERs on the same date (2012-06-20), the lower figure from the validation report (3,284,853) is privileged as a conservative choice, and the discrepancy drives down transparency and claim safety. Crediting period inconsistency is resolved by privileging the monitoring report’s longer period (2007-2027) as it aligns with typical VCS crediting structures, but the conflict signals documentation reliability issues that keep the overall score in the moderate range.

Audit Analysis

This is a VCS REDD+ avoided planned deforestation project using VM0007 with VVB-confirmed additionality and a stated buffer contribution, and no material findings or corrective actions reported in the extracted record. However, multiple cross-document inconsistencies (buffer percentage, reversals, safeguards, and verified ERs) reduce confidence in the reliability of key risk and volume figures. Overall quality appears moderate, with elevated over-crediting and claims-risk driven by contradictions and missing leakage and baseline reassessment details.

Project Description

The CIKEL Brazilian Amazon REDD APD Project aims to avoid emissions from planned deforestation on a property in Paragominas Municipality, Para state, Brazil. The main activity of the CIKEL Brazilian Amazon REDD APD Project is the cancelation of the planned deforestation activities and decision to instead conserve the forest area and continue limited forest management activities in the area under Forest Stewardship Council® Certification (FSC®) with Low Impact Logging (SFMLIL) practices. Also, the company is intensifying and improving its practices to support the sustainable social development, maintaining and improving the biodiversity monitoring at the RCC in the framework of FCS certification and REDD activities. The RCC property includes five forest areas: Rio Capim, Poty, Cauaxi, Sumal and Caculé, totaling 209,130.54 ha. The project area is a subset of the RCC property and covers an area of 27,434.9 ha of native forest. The project will avoid 9,432,299 tCO2 that would have been emitted into the atmosphere over the next ten years.

Red Flags

  • Conflicting buffer pool contribution values (15.5% in a monitoring report vs 10% in a validation report) undermine permanence-risk clarity.
  • Reversal status is inconsistent across documents (none reported vs reported), creating uncertainty about non-permanence outcomes and buffer adequacy.
  • Verified emission reductions are inconsistent for the same date (4,094,462 vs 3,284,853), increasing over-crediting/claims risk.
  • Leakage is said to be quantified but the actual leakage deduction percentage is not found in the extracted record.

Credit Vintages

Issued Retired Available
2007
2,545,150 1,522,226 1,022,924
2011
57,439 55,230 2,209
2012
7,711 7,434 277
2013
21,463 20,463 1,000
2014
79,129 79,129 0
2015
31,156 30,156 1,000
2016
85,602 64,099 21,503
2017
86,910 41,009 45,901
Total 2,914,560 1,819,746 1,094,814

Cosa migliorerebbe questo punteggio

  • Publish a clear reconciliation table across versions showing buffer pool contribution, any reversals (if any), and the exact verified ER totals by monitoring period with registry issuance references.
  • Disclose the quantified leakage deduction percentage and the baseline reassessment approach/date (or confirm none required under VM0007 for the period) in a single, current monitoring/verification summary.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Buffer present but reversal reporting inconsistent

Leakage

Quantified in narrative but % not evidenced

Baseline

Project-specific baseline; reassessment timing unclear

Safeguards

FPIC/grievance/benefit-sharing reported but contradicted

Double-claim

CORSIA/CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-02 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti