Skip to main content
CFCUrban Forest CarbonUnited StatesGeneral Methodologyv2.1

Cleveland Forest Carbon Offsets

CFC-cleveland-forest-carbon-offset ↗

#25of 345 in United States#10of 59 in City Forest Credits (CFC)

6.4/ 10
Integrity
6.5
Transparency
6.0
Claim Safety
6.0
Documentation
7.5

Audit Analysis

The Cleveland Forest Carbon Offsets project is a tree preservation initiative under the City Forest Credits standard with a VVB-verified combined additionality test and a 10% buffer pool. The verification report confirms no significant canopy loss over the three-year monitoring period, though several key parameters (leakage percentage, FNRB method, baseline reassessment date) remain unstated. The project is not CORSIA-eligible, and the minor discrepancy between the PDD and verification report ERR figures was resolved in favor of the lower, verified value.

Red Flags

  • Leakage justification is described as 'quantified' in the verification report, yet no specific deduction percentage is stated in any available document, leaving the actual magnitude of the leakage treatment unverifiable.
  • The baseline is project-specific with no documented reassessment date, and the CFC standard's reassessment cadence is not confirmed in the extracted record.
  • Safeguards documentation is absent: no FPIC, no grievance mechanism, and no explicit safeguards statement were found in any of the five source documents.

Credit Vintages

IssuedRetiredAvailable
2021
4,13904,139
Total4,13904,139

Risk Indicators

Additionality

Combined test, VVB-verified

Permanence

mixed evidence / unresolved risk

Leakage

Quantified but no percentage stated

Baseline

Project-specific, no reassessment date

Safeguards

No FPIC, no grievance mechanism

Double-claim

Not CORSIA-eligible, CCP not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents