COMMUNITY CARBON SAFE WATER DRINKING PROGRAMME-VPA 20
GS-4309 ↗ · current registry ID: GS12342
#56of 1329 in Industrial#3of 163 in Uganda#149of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard safe-drinking-water energy-efficiency project in Uganda with VVB-confirmed additionality and a recently reassessed project-specific baseline. The project over-delivers relative to its ex-ante estimate (≈132% of pro-rata expectation), but the absence of a verified ERR figure, an open finding (FAR#01), a 0% leakage deduction with a contradictory earlier justification, and multiple data inconsistencies across documents temper confidence. Overall a moderate-quality project with identifiable gaps in verification completeness and data consistency.
Red Flags
- Total ERR verified figure is not stated in any available document; only the claimed 57,270 tCO₂e (monitoring report, Dec 2025) is available, leaving the verification chain incomplete.
- FAR#01 (a finding raised during verification) remains open and unresolved as of the verification report dated 26 Dec 2025.
- Leakage deduction is 0% with a 'deemed negligible' justification in the 2025 verification report, while the 2022 validation report described leakage as 'quantified' — the basis for the zero deduction is not clearly documented.
- Crediting period is inconsistent across two verification reports (2021–2025 vs 2024–2028), creating ambiguity about the project's actual crediting window.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2024 | 2,095 | 0 | 2,095 | |
| Total | 2,095 | 0 | 2,095 |
Risk Indicators
VVB-confirmed combined test
no reversals reported
0% deduction, justification contradicts earlier report
Project-specific, reassessed 2025
FPIC, grievance mechanism, safeguards documented
CCP and CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →