Skip to main content
ICRAvoidance / ReductionILAMS-III.F

Compost Or Ltd

ICR-254 ↗

#1137of 1329 in Industrial#83of 154 in Intl. Carbon Registry (ICR)#38of 43 in AMS-III.F

4.0/ 10
Integrity
4.5
Transparency
4.0
Claim Safety
3.5
Documentation
4.0

Audit Analysis

Compost Or is an ICR-standard waste composting avoidance project in Israel with a verified additionality assessment and no reported reversals, but it is undermined by a 0% buffer pool, contradictory leakage justifications across documents, a project-specific baseline, and a substantial list of material findings and corrective actions (16 CLs/CARs and 19 corrective actions) that raise concerns about the robustness of the verification. Multiple ERR figures conflict between the verification report, validation report, and appendix, limiting confidence in the claimed credit volume.

Red Flags

  • Ex-ante lifetime ERR differs by nearly 2× between the verification report (2,265,417) and the validation report (4,336,010), creating uncertainty about the true baseline credit volume
  • Leakage justification is contradictory: the PDD states leakage was 'quantified' while the validation report records it as 'deemed negligible' with a 0% deduction
  • Buffer pool is 0% for an avoidance project, leaving no permanence buffer against potential reversal
  • 16 material findings (CLs and CARs) include missing waste-supplier agreements, missing stakeholder-consultation evidence, methane misclassified as a minor source, and inconsistent methodology references (AMS-III.F vs AMS-III.D)
  • FPIC was not conducted despite the project's community-facing waste-collection operations

Credit Vintages

IssuedRetiredAvailable
2013
336,1890336,189
2014
433,6010433,601
2015
433,6010433,601
2016
433,6010433,601
2017
433,6010433,601
2018
433,6010433,601
2019
433,6010433,601
2020
433,6010433,601
2021
433,6010433,601
2022
433,6010433,601
2023
97,411097,411
Total4,336,00904,336,009

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, contradictory justification across docs

Baseline

Project-specific, reassessment date not stated

Safeguards

Grievance mechanism present, no FPIC, missing consultation evidence

Double-claim

CORSIA and CCP status both not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02AMS-III.F.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents