Composting of municipal organic waste in Lome

GS-1615 ↗ · current registry ID: GS1147

#1002of 1329 in Industrial#6of 15 in Togo#1434of 1801 in Gold Standard (GS)

4.3/ 10
Integrity
4.5
Transparency
4.0
Claim Safety
4.5
Documentation
4.0

Audit Analysis

A Gold Standard composting project in Lomé, Togo, using the well-established AMS.III-F methodology, with a barrier additionality test and FPIC/grievance mechanisms in place. However, the absence of a named VVB, a project-specific modeled baseline with no recorded reassessment, unaddressed reversal risk, and a 0% leakage deduction justified only as 'deemed negligible' leave meaningful gaps in the integrity and transparency record. The project over-delivered relative to its PDD estimate (251% of the claimed figure for the 2020 period), which is reassuring for claim safety but highlights calibration uncertainty.

Red Flags

  • No VVB name found in any extracted document, making independent verification of additionality and MRV unverifiable
  • Reversal risk explicitly 'not addressed' and no buffer pool percentage stated, despite the project relying on waste diversion that could be reversed if the composting facility closes
  • Material finding: weighbridge calibration and systematic documentation were deficient, requiring a corrective action
  • Safeguards documentation is inconsistent between the 2018 verification report (mentioned) and the 2021 monitoring report (not mentioned)
  • Low extraction confidence across the document set, indicating at least one key document was poorly readable

Credit Vintages Exhausted

IssuedRetiredAvailable
2013
1,0931,0930
2014
9589580
2015
1,7831,7830
2016
7387380
2017
4294290
2018
1,3641,3640
2019
1,4271,4270
2020
5595590
Total8,3518,3510

Risk Indicators

Additionality

Barrier test present but VVB verification unconfirmed

Permanence

Reversal risk not addressed

Leakage

0% deduction, 'deemed negligible' only

Baseline

Project-specific, modeled; no reassessment date

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status both unstated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents