Comprehensive utilization of waste coal gas for electricity generation project in Shaanxi Xinglong Cogeneration Co. Ltd
#349of 1329 in Industrial#490of 1084 in China#667of 1459 in CDM (UNFCCC)#9of 28 in ACM0012
Audit Analysis
A CDM waste-coal-gas-to-electricity project with a VVB-confirmed investment additionality test and no reported reversal events, but weakened by a 0% leakage deduction with inconsistent justification across documents, a 2014 grid emission factor, and a project-specific baseline. The monitoring report covers only 5 of the 7 crediting years, and several key MRV parameters (FNRB, usage monitoring, end-use tracking) are absent from the extracted record.
Red Flags
- Leakage deduction of 0% is justified as 'deemed negligible' in the 2016 validation report but is simply 'not addressed' in the 2022 monitoring report, leaving the 0% figure without a consistent, documented rationale.
- The grid emission factor of 0.57786 tCO2/MWh is drawn from 2014 data; the 2022 monitoring report's CAR02 explicitly flags the need to update this factor, suggesting the baseline may be overstated.
- A two-year gap exists between the end of the monitoring period (July 2020) and the end of the crediting period (August 2022) with no second monitoring report in the extracted record.
- FNRB value, usage monitoring method, and end-use tracking are all absent from the available documents, limiting the ability to independently verify the claimed reductions.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 88,866 | 0 | 88,866 | |
| 2013 | 1,136,830 | 0 | 1,136,830 | |
| Total | 1,225,696 | 0 | 1,225,696 |
Risk Indicators
VVB-confirmed investment test
no reversal data (EE project, lower risk)
0% deduction; justification inconsistent across documents
Project-specific; grid EF from 2014; CAR flags update needed
Safeguards mentioned; no FPIC or grievance mechanism documen
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →