Skip to main content
VCSAgriculture Forestry and Other Land UseColombia Registry: RegisteredVM0006

Concosta REDD+ Project

VCS-1400 ↗

#163of 261 in Soil carbon#104of 124 in Colombia#1060of 1339 in Verra (VCS)#9of 10 in VM0006

4.3/ 10
Integrity
4.5
Transparency
4.0
Claim Safety
5.0
Documentation
3.5

Audit Analysis

The Concosta REDD+ Project in Colombia has a verified additionality test, a 10% buffer pool, and a quantified 20% leakage deduction, but is undermined by an extensive list of material findings (32 VCS NCRs, 18 CCB NCRs, 29 corrective actions) covering indigenous community engagement, armed-conflict risk, boundary disputes, and incomplete monitoring. The project delivered only about 63% of its pro-rata ex-ante expectation for the 2018–2019 monitoring period, which is conservative but the discrepancy between the 2019 and 2024 verification reports (622,548 vs 421,840 tCO₂e) raises data-reliability questions. Overall, the project meets minimum VCS requirements but carries significant social, governance, and documentation risks typical of a REDD+ project operating in a conflict-affected region of Colombia.

Red Flags

  • 32 VCS nonconformity reports and 18 CCB NCRs were raised during verification, indicating systemic compliance gaps in monitoring, community engagement, and risk management
  • The project did not undergo a CCB verification public comment period prior to verification, a procedural gap that limits external scrutiny
  • Material findings include unresolved concerns about indigenous community consultation, boundary disputes, armed-conflict risk, and incomplete non-permanence risk reporting
  • Contradictory verified ERR figures (421,840 in the 2024 report vs 622,548 in the 2019 report) for what appears to be the same monitoring period raise data-reliability concerns
  • The ex-ante lifetime ERR is inconsistent within the same 2015 validation report (10,019,347 vs 8,272,143 tCO₂e), undermining confidence in the baseline projection

Credit Vintages

IssuedRetiredAvailable
2013
51,72947,2294,500
2014
107,65730,36477,293
2015
119,281119,2810
2016
126,088126,0880
2017
132,2641,000131,264
2018
22,72621,2621,464
Total559,745345,224214,521

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Buffer present but risk reporting incomplete

Leakage

20% quantified deduction

Baseline

Project-specific, reassessment not documented

Safeguards

FPIC and grievance present but community concerns unresolved

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-09VM0006

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents