CONSERVATION PROJECT REDD+ SUR DEL META BOSQUES DE PAZ, SUSTENTO DE VIDA
#77of 261 in Soil carbon#51of 124 in Colombia#648of 1339 in Verra (VCS)#11of 29 in VM0015
Audit Analysis
A VCS REDD+ conservation project in Colombia with a verified combined additionality test and a substantial 22% buffer pool, but significant data gaps in verified monitoring, FNRB, and CORSIA/CCP status. The 7-fold reduction in lifetime ERR between the PDD and the validation report, while protective of claim integrity, signals substantial baseline uncertainty. Two open Further Action Requests and the absence of any verified monitoring period data limit confidence in current credit delivery.
Red Flags
- Lifetime ERR reduced from 26,696,589 tCO2e in the PDD (2020) to 3,768,645 tCO2e in the validation report (2024) — a 7-fold discrepancy that, while conservative, indicates major baseline uncertainty
- Leakage deduction dropped from 15% in the PDD to 2% in the validation report; the justification for this 13-percentage-point reduction is not detailed in the extracted record
- Two Further Action Requests (FARs) remain open at the time of the validation report
- No verified monitoring-period ERR data is available in the extracted documents, preventing any assessment of actual credit delivery
- CORSIA eligibility and CCP approval status are not stated in any available document
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
22% buffer, no reversals, but field marked not addressed
2% quantified but reduced from 15% in PDD
Project-specific, reassessment date not stated
FPIC, grievance mechanism, safeguards documented
CORSIA and CCP status both unstated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →